<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Journal Publishing DTD with OASIS Tables with MathML3 v1.1 20151215//EN" "JATS-journalpublishing-oasis-article1-mathml3.dtd">
<article article-type="research-article" dtd-version="1.1" xml:lang="es" xmlns:ali="http://www.niso.org/schemas/ali/1.0/" xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance">
	<front>
		<journal-meta>
			<journal-id journal-id-type="publisher-id">IC</journal-id>
			<journal-title-group>
				<journal-title>Informes de la Construcci&#xf3;n</journal-title>
				<abbrev-journal-title abbrev-type="publisher">Inf. constr.</abbrev-journal-title>
			</journal-title-group>
			<issn publication-format="electronic">1988-3234</issn>
			<issn-l>0020-0883</issn-l>
			<publisher>
				<publisher-name>Consejo Superior de Investigaciones Cient&#xed;ficas</publisher-name>
			</publisher>
		</journal-meta>
		<article-meta>
			<article-id pub-id-type="publisher-id">ic.6452</article-id>
			<article-id pub-id-type="doi">10.3989/ic.6452</article-id>
			<article-categories>
				<subj-group subj-group-type="heading">
					<subject>Art&#xed;culos</subject>
				</subj-group>
			</article-categories>
			<title-group>
				<article-title>M&#xe9;todo para la direcci&#xf3;n de obra de viviendas modulares pasivas</article-title>
				<trans-title-group xml:lang="en">
					<trans-title>Method for construction management of passive modular houses</trans-title>
				</trans-title-group>
			</title-group>
			<contrib-group>
				<contrib contrib-type="author" corresp="yes">
					<contrib-id contrib-id-type="orcid">https://orcid.org/0000-0002-8850-3168</contrib-id>
					<name>
						<surname>Meire</surname>
						<given-names>Carolina</given-names>
					</name>
					<degrees>Ingeniero de Edificaci&#xf3;n</degrees>
					<email xlink:href="carolina.meire@udc.es">carolina.meire@udc.es</email>
					<aff id="aff1"><institution content-type="university">Universidade da Coru&#xf1;a</institution>. <institution>ETS Arquitectura 15071</institution>, <addr-line>A Coru&#xf1;a</addr-line> (<country>Espa&#xf1;a</country>).</aff>
				</contrib>
				<contrib contrib-type="author">
					<contrib-id contrib-id-type="orcid">https://orcid.org/0000-0002-8267-5372</contrib-id>
					<name>
						<surname>Linhares</surname>
						<given-names>Patricia</given-names>
					</name>
					<degrees>Dr. Arquitecto</degrees>
					<role>Profesor Contratada Interina</role>
					<aff id="aff2"><institution content-type="university">Universidade da Coru&#xf1;a</institution>. <institution>ETS Arquitectura 15071</institution>, <addr-line>A Coru&#xf1;a</addr-line> (<country>Espa&#xf1;a</country>).</aff>
				</contrib>
				<contrib contrib-type="author">
					<contrib-id contrib-id-type="orcid">https://orcid.org/0000-0003-0283-0852</contrib-id>
					<name>
						<surname>Hermo</surname>
						<given-names>V&#xed;ctor</given-names>
					</name>
					<degrees>Dr. Arquitecto</degrees>
					<role>Profesor Contratado Doctor</role>
					<aff id="aff3"><institution content-type="university">Universidade da Coru&#xf1;a</institution>. <institution>ETS Arquitectura 15071</institution>, <addr-line>A Coru&#xf1;a</addr-line> (<country>Espa&#xf1;a</country>).</aff>
				</contrib>
			</contrib-group>
			<pub-date pub-type="epub">
				<day>01</day>
				<month>12</month>
				<year>2023</year>
			</pub-date>
			<pub-date pub-type="collection">
				<month>12</month>
				<year>2023</year>
			</pub-date>
			<volume>75</volume>
			<issue>572</issue>
			<elocation-id>e520</elocation-id>
			<history>
				<date date-type="received">
					<day>20</day>
					<month>03</month>
					<year>2023</year>
				</date>
				<date date-type="accepted">
					<day>19</day>
					<month>10</month>
					<year>2023</year>
				</date>
				<date date-type="pub">
					<day>12</day>
					<month>12</month>
					<year>2023</year>
				</date>
			</history>
			<permissions>
				<copyright-statement>&#xa9; 2023 CSIC</copyright-statement>
				<copyright-year>2023</copyright-year>
				<license license-type="open-access" xlink:href="https://creativecommons.org/licenses/by/4.0/">
					<license-p>Este es un art&#xed;culo de acceso abierto distribuido bajo los t&#xe9;rminos de la licencia de uso y distribuci&#xf3;n Creative Commons Reconocimiento 4.0 Internacional (CC BY 4.0).</license-p>
				</license>
			</permissions>
			<self-uri xlink:href="http://informesdelaconstruccion.revistas.csic.es/index.php/informesdelaconstruccion/article/view/XXXX/XXXX"/>
			<abstract>
				<title>Resumen</title>
				<p>Este art&#xed;culo presenta el dise&#xf1;o y comprobaci&#xf3;n de un innovador m&#xe9;todo de direcci&#xf3;n de obra para construcciones modulares pasivas, alineado con la metodolog&#xed;a lean construction - Last planner system. Y que, a su vez, garantice los criterios de dise&#xf1;o de una construcci&#xf3;n ecoeficiente.</p>
				<p>Motivado por la complejidad que reside en la ejecuci&#xf3;n de construcciones modulares. Se define esta gu&#xed;a con el objetivo de potenciar la eficiencia de la puesta en obra y asegurar un alto grado de industrializaci&#xf3;n. Para ello se detallan las singularidades de las fases de ejecuci&#xf3;n, los hitos de verificaci&#xf3;n y se estudian los errores recurrentes y su subsanaci&#xf3;n.</p>
				<p>El documento concluye con la obtenci&#xf3;n de resultados significativos sobre los par&#xe1;metros que garantizan la productividad de la construcci&#xf3;n &#x201c;plazo, coste, calidad y sostenibilidad&#x201d;.</p>
			</abstract>
			<trans-abstract xml:lang="en">
				<title>Abstract</title>
				<p>This article presents the design and verification of an innovative construction management method for passive modular constructions, aligned with the lean construction - Last planner system methodology. In addition, that in turn, guarantees the design criteria of an eco-efficient construction.</p>
				<p>Motivated by the complexity that resides in the execution of modular constructions. This guide is defined with the aim of enhancing the efficiency of commissioning and ensuring a high degree of industrialization. For this, the singularities of the execution phases, the verification milestones are detailed, and recurring errors and their correction are studied.</p>
				<p>The document concludes with the obtaining of significant results on the parameters that guarantee the productivity of the construction &#x201c;term, cost, quality and sustainability&#x201d;.</p>
			</trans-abstract>
			<kwd-group>
				<kwd>gu&#xed;a de direcci&#xf3;n de obra</kwd>
				<kwd>construcci&#xf3;n industrializada</kwd>
				<kwd>construcci&#xf3;n modular ligera</kwd>
				<kwd>construcci&#xf3;n pasiva</kwd>
				<kwd>lean construction</kwd>
				<kwd>Last Planner System</kwd>
			</kwd-group>
			<kwd-group xml:lang="en">
				<kwd>construction management guide</kwd>
				<kwd>industrialized construction</kwd>
				<kwd>lightweight modular construction</kwd>
				<kwd>passive construction</kwd>
				<kwd>lean construction</kwd>
				<kwd>Last Planner System</kwd>
			</kwd-group>
			<counts>
				<fig-count count="23"/>
				<table-count count="2"/>
				<equation-count count="0"/>
				<ref-count count="46"/>
				<page-count count="12"/>
			</counts>
		</article-meta>
	</front>
	<body>
		<sec id="sec1" sec-type="intro">
			<label>1.</label>
			<title>Introducci&#xf3;n</title>
			<p>Nuevas empresas han detectado la oportunidad y han introducido el concepto de construcci&#xf3;n modular, que se refleja en la abundancia de literatura cient&#xed;fica reciente en torno a esta tem&#xe1;tica. Que van desde, la revisi&#xf3;n de los aspectos t&#xe9;cnicos de la planificaci&#xf3;n y coordinaci&#xf3;n de la construcci&#xf3;n modular, (<xref ref-type="bibr" rid="B1">1</xref>) pasando por las destacables ventajas de los sistemas de CML, tanto econ&#xf3;micamente como ambientalmente (<xref ref-type="bibr" rid="B2">2</xref>), el uso de softwares en los sistemas de edificaci&#xf3;n industrializados (<xref ref-type="bibr" rid="B3">3</xref>), hasta el estudio de secuencias de re fabricaci&#xf3;n en operaciones de ensamblaje de construcciones industrializadas (<xref ref-type="bibr" rid="B4">4</xref>).</p>
			<p>En este contexto, el IPCC (Grupo Intergubernamental de Expertos sobre el Cambio Clim&#xe1;tico) informa que m&#xe1;s del 32% del gasto total de energ&#xed;a mundial y el 19% de las emisiones totales de GEI (gases de efecto invernadero) se deben a los procesos energ&#xe9;ticos de los edificios (<xref ref-type="bibr" rid="B5">5</xref>-<xref ref-type="bibr" rid="B7">7</xref>).Tal y como explica Santamouris 2013 (<xref ref-type="bibr" rid="B8">8</xref>) la construcci&#xf3;n presenta un consumo energ&#xe9;tico muy elevado en comparaci&#xf3;n con otros sectores. Se deben garantizar los nuevos est&#xe1;ndares de sostenibilidad exigidos por el horizonte 2020 (<xref ref-type="bibr" rid="B9">9</xref>). Siendo el principal instrumento para alcanzar estos objetivos en el sector de la construcci&#xf3;n las Directivas Europeas relativas a la eficiencia energ&#xe9;tica de los edificios (EPBD) (<xref ref-type="bibr" rid="B10">10</xref>) y m&#xe1;s concretamente la Directiva 2010/31/UE (EPBD) (<xref ref-type="bibr" rid="B11">11</xref>) garantizando que para 2021 todos los edificios de nueva construcci&#xf3;n, fuesen de consumo de energ&#xed;a casi nulo (nZEB) (<xref ref-type="bibr" rid="B12">12</xref>, <xref ref-type="bibr" rid="B13">13</xref>). </p>
			<p>Por lo tanto, se pretende potenciar la competitividad del sector con marcada tendencia hacia la industrializaci&#xf3;n, el cual debe ser m&#xe1;s eficiente y con un mejor comportamiento medioambiental. Y contar con una metodolog&#xed;a optimizada que permita eliminar los desv&#xed;os en plazos y costes tan habituales en la construcci&#xf3;n convencional. La productividad del sector es una materia que preocupa y genera diversos debates acerca del modelo de producci&#xf3;n adecuado para mejorar su rendimiento (<xref ref-type="bibr" rid="B14">14</xref>). Asimismo, en comparaci&#xf3;n con otras industrias, su productividad, en las &#xfa;ltimas d&#xe9;cadas, ha sido muy baja (<xref ref-type="bibr" rid="B15">15</xref>).</p>
			<p>De los m&#xe9;todos de referencia que miden la productividad en la construcci&#xf3;n destaca el Lean Construcci&#xf3;n (<xref ref-type="bibr" rid="B16">16</xref>), un sistema de planificaci&#xf3;n y control de la producci&#xf3;n que busca maximizar el valor del proceso constructivo y disminuir la incertidumbre y variabilidad en el flujo de trabajo para alcanzar compromisos confiables (<xref ref-type="bibr" rid="B15">15</xref>) y m&#xe1;s concretamente el Last Planner System (LPS), desarrollado por Ballard y Howell (<xref ref-type="bibr" rid="B17">17</xref>) para mejorar la fiabilidad de la planificaci&#xf3;n, aumentar la productividad de la construcci&#xf3;n, garantizando un flujo de trabajo sin interrupciones (<xref ref-type="bibr" rid="B18">18</xref>). Este sistema de planificaci&#xf3;n y control de la producci&#xf3;n ha transformado a nivel operacional y gerencial la industria de la construcci&#xf3;n (<xref ref-type="bibr" rid="B19">19</xref>, <xref ref-type="bibr" rid="B20">20</xref>), identificando desaf&#xed;os a los que se enfrentan los profesionales de la construcci&#xf3;n durante la implementaci&#xf3;n (<xref ref-type="bibr" rid="B21">21</xref>) y los beneficios (<xref ref-type="bibr" rid="B22">22</xref>) del uso de LPS. Destacando la importancia de la implicaci&#xf3;n de la organizaci&#xf3;n en el proceso de la planificaci&#xf3;n. (<xref ref-type="bibr" rid="B23">23</xref>).</p>
			<p>En Espa&#xf1;a el uso de este tipo de metodolog&#xed;as, con una alta capacidad de aplicaci&#xf3;n, es relativamente reciente (<xref ref-type="bibr" rid="B24">24</xref>), destaca el porcentaje de conocimiento y la revisi&#xf3;n de la literatura de Hoyos (<xref ref-type="bibr" rid="B19">19</xref>) y el potencial de implantaci&#xf3;n de la gu&#xed;a editada por el Consejo General de la Arquitectura T&#xe9;cnica de Espa&#xf1;a (CGATE) (<xref ref-type="bibr" rid="B25">25</xref>), actuando sobre los 3 factores m&#xe1;s influyentes en la eficiencia y productividad de la puesta en obra; la calidad de lo ejecutado, el plazo, el coste. </p>
			<p>A mayores, debemos tener muy en cuenta el factor sostenibilidad, tanto durante la construcci&#xf3;n, como garantizando una mayor eficiencia de las edificaciones durante la fase de uso. Existen diversos, sellos de sostenibilidad, como Leed, Breem o Verde. Considerando un gran referente el mundialmente reconocido est&#xe1;ndar Passivhaus. Donde, la definici&#xf3;n original seg&#xfa;n Feist 2005 (<xref ref-type="bibr" rid="B26">26</xref>), &#x201c;Una casa pasiva es una edificaci&#xf3;n en la que el confort t&#xe9;rmico (ISO 7730) se garantiza solo por calentamiento o refrigeraci&#xf3;n del flujo de aire, de acuerdo al volumen de intercambio requerido para la calidad del aire interior (DIN 1946) sin utilizar ayuda adicional al aire recirculado&#x201d;. Y a su vez, los criterios para cumplir el est&#xe1;ndar fueron definidos por Gantolier 2010 (<xref ref-type="bibr" rid="B27">27</xref>). </p>
			<p>Para garantizar dichos requisitos, es imperativo que las casas construidas seg&#xfa;n los est&#xe1;ndares actuales cumplan con las expectativas de un dise&#xf1;o energ&#xe9;tico detallado (<xref ref-type="bibr" rid="B28">28</xref>, <xref ref-type="bibr" rid="B29">29</xref>), durante la etapa de ejecuci&#xf3;n. Puesto que a menudo, tal y como lo describe Pieter de Wilde (<xref ref-type="bibr" rid="B30">30</xref>) &#x201c;hay una diferencia significativa entre el rendimiento energ&#xe9;tico previsto (calculado) de los edificios y el uso real de energ&#xed;a medido una vez que los edificios est&#xe1;n operativos.&#x201d; Y una de las principales razones identificadas para esta brecha de rendimiento energ&#xe9;tico son las pr&#xe1;cticas deficientes durante la puesta en obra. </p>
			<p>Surge el reto y por lo tanto una oportunidad detectada en el sector, de una nueva visi&#xf3;n de la direcci&#xf3;n de obra, que tendr&#xe1; que estar adaptada a las circunstancias de su tiempo y a las necesidades del momento en el que vivimos, que garantice una optimizaci&#xf3;n de los procesos y la calidad de los resultados. Y todo ello bajo el enfoque de la sostenibilidad durante la fase de ejecuci&#xf3;n y que adem&#xe1;s tendr&#xe1; en cuenta los ahorros y aspectos positivos durante la etapa de uso de las edificaciones. </p>
			<p> Concebido gracias a la experiencia adquirida durante el desarrollo y materializaci&#xf3;n en los proyectos de investigaci&#xf3;n de sus predecesores cient&#xed;fico-t&#xe9;cnicos (<xref ref-type="bibr" rid="B31 B32 B33 B34">31-34</xref>), de la mano de la Universidad de la Coru&#xf1;a. El sistema constructivo (<xref ref-type="bibr" rid="B35">35</xref>) fue optimizado y dise&#xf1;ado con el objetivo primordial de una puesta en obra &#xe1;gil, de calidad, sostenible y sin desv&#xed;os en el presupuesto. No obstante, tras la construcci&#xf3;n de las primeras viviendas, surgen diversas dificultades que afectan a la productividad de la etapa de ejecuci&#xf3;n.</p>
			<p>El objeto de la investigaci&#xf3;n es la creaci&#xf3;n de un M&#xe9;todo de direcci&#xf3;n de obra de construcciones modulares pasivas, que garantice la mejora de la productividad durante las fases de ejecuci&#xf3;n.</p>
		</sec>
		<sec id="sec2" sec-type="methods">
			<label>2.</label>
			<title>Metodolog&#xed;a</title>
			<p>El foco de esta investigaci&#xf3;n se origina en Proyectop&#xed;a, una empresa de base tecnol&#xf3;gica ubicada en Galicia, que avalada por organismos auton&#xf3;micos y nacionales de investigaci&#xf3;n (CDTI y GAIN) ha creado un innovador sistema modular de aluminio extruido &#x201c;Walluminium,&#x201d; para la construcci&#xf3;n de viviendas unifamiliares de bajo consumo energ&#xe9;tico. La motivaci&#xf3;n de este art&#xed;culo aflora tras la ejecuci&#xf3;n de varias viviendas en las que surgieron errores recurrentes en obra que afectaban a la productividad de las mismas.</p>
			<p>Se define la investigaci&#xf3;n, a trav&#xe9;s de un proceso de dise&#xf1;o y comprobaci&#xf3;n; 1. Construcci&#xf3;n de las primeras viviendas modulares Walluminium, 2. identificaci&#xf3;n de los errores recurrentes en obra, se plantean procesos de mejora, se constata la necesidad de la creaci&#xf3;n de una gu&#xed;a de obra que determine los procesos y las caracter&#xed;sticas especiales de este tipo de construcci&#xf3;n modular pasiva. 3. Se toma como referencia la publicaci&#xf3;n por el Consejo General de la Arquitectura T&#xe9;cnica de Espa&#xf1;a (<xref ref-type="bibr" rid="B25">25</xref>), y se procede con la 4. creaci&#xf3;n de la gu&#xed;a de direcci&#xf3;n de obra alineada con la metodolog&#xed;a lean construction y m&#xe1;s concretamente con Last planner system, que, a su vez, garantice el cumplimento de los est&#xe1;ndares pasivos. 5. Se determina la estructura de desglose de trabajo y la organizaci&#xf3;n de los agentes en las obras modulares pasivas, 6. posteriormente se identifican y planifican las de fases de ejecuci&#xf3;n. 7. Se comprueba la aplicaci&#xf3;n del m&#xe9;todo de direcci&#xf3;n de obra Walluminium, con la puesta en pr&#xe1;ctica durante la ejecuci&#xf3;n de tres obras concretas; &#x201c;Porri&#xf1;o MFR, Boiro CSH y Cangas MMG&#x201d;. 8. Se identifican los errores y 9. se optimiza el manual. Por &#xfa;ltimo, 10. se estudian los resultados obtenidos, y se comparan con las publicaciones de referencia y experiencias m&#xe1;s recientes valorando las ventajas del m&#xe9;todo de direcci&#xf3;n de obra, y los beneficios de su utilizaci&#xf3;n, respecto a los par&#xe1;metros principales objeto de estudio; plazo, coste, calidad y sostenibilidad.</p>
		</sec>
		<sec id="sec3">
			<label>3.</label>
			<title>Teor&#xed;a y c&#xe1;lculos</title>
			<sec id="sec3.1">
				<label>3.1.</label>
				<title>Problem&#xe1;tica de la construcci&#xf3;n modular</title>
				<p>Percat&#xe1;ndonos de que la problem&#xe1;tica de la direcci&#xf3;n de obra modular, resid&#xed;a en la complejidad y novedad de su puesta en obra. </p>
				<p>En general, problemas de incumplimiento de plazos, derivados del desconocimiento de la industrializaci&#xf3;n del sistema, con la falta de coordinaci&#xf3;n entre taller y obra. Desv&#xed;os de presupuesto, debidos a que la correcta ejecuci&#xf3;n de las partidas no se materializaba a la primera, conllevando la necesidad de rehacerlas. A su vez, la mano de obra no cualificada o con inexperiencia en este tipo de construcci&#xf3;n modular, as&#xed; como, con creencias y experiencia en obra convencional, actuaban en nuestra contra. Advertimos que la puesta en obra, conllevaba asociadas diversas dificultades que son comunes a la construcci&#xf3;n convencional (<xref ref-type="bibr" rid="B24">24</xref>, <xref ref-type="bibr" rid="B25">25</xref>, <xref ref-type="bibr" rid="B36">36</xref>), as&#xed; como, a otras derivadas de la problem&#xe1;tica de la construcci&#xf3;n modular e industrializada (<xref ref-type="bibr" rid="B37 B38 B39">37-39</xref>). Dichos errores recuentes en nuestras obras son identificados y agrupados en funci&#xf3;n de los par&#xe1;metros de medida a los que afecten: plazo, coste, calidad y sostenibilidad.</p>
				<p>
					<bold>Incumplimiento de plazos:</bold>
				</p>
				<list list-type="bullet">
					<list-item>
						<p>Incorrecta estimaci&#xf3;n del cronograma, motivado por el desconocimiento de plazos, al no existir experiencias previas de ejecuci&#xf3;n. </p>
					</list-item>
					<list-item>
						<p>Desv&#xed;os en los plazos de suministro de materiales (falta de antelaci&#xf3;n y/o previsi&#xf3;n, desconocimiento de los plazos de suministro, listas de espera).</p>
					</list-item>
					<list-item>
						<p>Problemas de planificaci&#xf3;n, derivados de la mala coordinaci&#xf3;n entre subcontratas, que impiden el correcto avance seg&#xfa;n el cronograma determinado.</p>
					</list-item>
					<list-item>
						<p>Bajo grado de industrializaci&#xf3;n, con escaso aprovechamiento del potencial de fabricaci&#xf3;n de elementos en serie en taller.</p>
					</list-item>
				</list>
				<p>
					<bold>Aumento del Coste total de la obra</bold>
				</p>
				<list list-type="bullet">
					<list-item>
						<p>Incorrecta planificaci&#xf3;n de elementos auxiliares (sin el aprovechamiento de los mismos cuando est&#xe1;n en obra, surgiendo la necesidad de volver a solicitarlos una vez se han retirado).</p>
					</list-item>
					<list-item>
						<p>Necesidad de compra de suministros con urgencia a proveedores que no eran de confianza, y con los que no exist&#xed;an acuerdos previos del coste del material, o de compra por volumen.</p>
					</list-item>
					<list-item>
						<p>Penalizaci&#xf3;n econ&#xf3;mica, causada por la entrega de obra fuera del plazo establecido en contrato con la propiedad.</p>
					</list-item>
				</list>
				<p>
					<bold>Calidad de la ejecuci&#xf3;n cuestionable</bold>
				</p>
				<list list-type="bullet">
					<list-item>
						<p>Problemas por la falta de formaci&#xf3;n de los operarios en un sistema constructivo industrializado innovador. </p>
					</list-item>
					<list-item>
						<p>Avance en tareas decisivas sin la verificaci&#xf3;n y conformidad por parte de la Direcci&#xf3;n facultativa, conllevando el tener que repetirlas correctamente. </p>
					</list-item>
				</list>
				<p>
					<bold>Sostenibilidad comprometida</bold>
				</p>
				<list list-type="bullet">
					<list-item>
						<p>Aislamiento interrumpido, generando puentes t&#xe9;rmicos. Errores en la instalaci&#xf3;n de las carpinter&#xed;as exteriores sin mantener la rotura de puente t&#xe9;rmico.</p>
					</list-item>
					<list-item>
						<p>Incorrecta instalaci&#xf3;n de la barrera de vapor. Deficiencias en sellados. </p>
					</list-item>
					<list-item>
						<p>Envolvente sin garantizar la continuidad de la capa herm&#xe9;tica alrededor de todo el volumen calefactado.</p>
					</list-item>
					<list-item>
						<p>Escasa formaci&#xf3;n de las subcontratas en materia de construcci&#xf3;n sostenible y requisitos de las edificaciones pasivas.</p>
					</list-item>
				</list>
				<p>Se hace patente la necesidad de definir un m&#xe9;todo, una gu&#xed;a de direcci&#xf3;n de obra que garantice el cumplimento de plazos, objetivos, sin desv&#xed;os en el coste y asegurando un alto est&#xe1;ndar de calidad. As&#xed; como, garantizando la sostenibilidad de las construcciones. El &#xe9;xito del sistema constructivo depende realmente de la perfecta puesta en obra. </p>
				<p>Se determinan a continuaci&#xf3;n los puntos relevantes para la direcci&#xf3;n de obra:</p>
			</sec>
			<sec id="sec3.2">
				<label>3.2.</label>
				<title>Presentaci&#xf3;n del manual</title>
				<p>El manual para la direcci&#xf3;n de obra de las viviendas Walluminium, define la realidad de la puesta en obra del sistema constructivo, est&#xe1; alineado con la metodolog&#xed;a Lean construction y m&#xe1;s concretamente con la metodolog&#xed;a Last planner system.</p>
				<sec id="sec3.2.1">
					<label>3.2.1.</label>
					<title>Planificaci&#xf3;n maestra</title>
					<list list-type="bullet">
						<list-item>
							<p>
								<bold>Objetivo principal:</bold> la construcci&#xf3;n de una vivienda modular pasiva Walluminium.</p>
						</list-item>
						<list-item>
							<p>
								<bold>Alcance</bold>: 6 meses, desde el acta de replanteo. </p>
						</list-item>
						<list-item>
							<p>
								<bold>Identificaci&#xf3;n de los stakeholders:</bold> cliente, administraci&#xf3;n, medioambiente, DF, contratas, proveedores.</p>
						</list-item>
						<list-item>
							<p>
								<bold>Estructura de desglose de trabajo (EDT)</bold> Identificamos en la <xref ref-type="fig" rid="f1">Figura 1</xref> tres niveles:</p>
							<list list-type="bullet">
								<list-item>
									<p>Nivel 1: construcci&#xf3;n vivienda modular pasiva</p>
								</list-item>
								<list-item>
									<p>Nivel 2. Fases 7 </p>
								</list-item>
								<list-item>
									<p>Nivel 3. Actividades de cada fase </p>
								</list-item>
							</list>
						</list-item>
						<list-item>
							<p>
								<bold>Estructura de organizaci&#xf3;n de agentes en obra</bold> (<xref ref-type="fig" rid="f2">Figura 2</xref>) de una vivienda modular pasiva<bold>:</bold>
							</p>
						</list-item>
					</list>
					<fig id="f1">
						<label>Figura 1</label>
						<caption>
							<title>Estructura de desglose de trabajo.</title>
						</caption>
						<graphic id="gra-1" xlink:href="IC-75-572-e520-gf1.png"/>
					</fig>
					<fig id="f2">
						<label>Figura 2</label>
						<caption>
							<title>Estructura de organizaci&#xf3;n de agentes en obra.</title>
						</caption>
						<graphic id="gra-2" xlink:href="IC-75-572-e520-gf2.png"/>
					</fig>
				</sec>
				<sec id="sec3.2.2">
					<label>3.2.2.</label>
					<title>Planificaci&#xf3;n de fases generales del proyecto</title>
					<p>Con el objetivo principal de definir y validar el trabajo a realizar para cumplir con cada hito de la obra. (<xref ref-type="bibr" rid="B25">25</xref>). En esta planificaci&#xf3;n (<xref ref-type="table" rid="t1">Tabla 1</xref>.) participan todos los responsables de cada actividad y &#xe1;reas funcionales del proyecto, siendo fundamental la alineaci&#xf3;n de objetivos y estrategias para la correcta ejecuci&#xf3;n de cada fase, se establecen a su vez los objetivos complementarios:</p>
					<list list-type="bullet">
						<list-item>
							<p>An&#xe1;lisis de riesgos del proyecto.</p>
						</list-item>
						<list-item>
							<p>Definici&#xf3;n de la estrategia de trabajo a seguir</p>
						</list-item>
						<list-item>
							<p>Identificaci&#xf3;n de recursos cr&#xed;ticos (equipos materiales, mano de obra)</p>
						</list-item>
						<list-item>
							<p>Coste de las actividades y totales por cada subcontrata</p>
						</list-item>
					</list>
					<table-wrap id="t1">
						<label>Tabla 1</label>
						<caption>
							<title>Plan de fases de vivienda modular pasiva.</title>
						</caption>
						<table>
							<colgroup>
								<col/>
								<col/>
								<col/>
								<col/>
								<col/>
								<col/>
								<col/>
								<col/>
								<col/>
								<col/>
								<col/>
								<col/>
								<col/>
								<col/>
								<col/>
								<col/>
								<col/>
								<col/>
								<col/>
								<col/>
								<col/>
								<col/>
								<col/>
								<col/>
								<col/>
							</colgroup>
							<thead>
								<tr>
									<th align="justify">PLAN DE FASES</th>
									<th align="justify" colspan="4">MES 1 </th>
									<th align="justify" colspan="4">MES 2 </th>
									<th align="justify" colspan="4">MES 3 </th>
									<th align="justify" colspan="4">MES 4 </th>
									<th align="justify" colspan="4">MES 5 </th>
									<th align="justify" colspan="4">MES 6 </th>
								</tr>
							</thead>
							<tbody>
								<tr>
									<td align="left">Fase 1 PLP</td>
									<td align="justify" style="background: lightgrey"> </td>
									<td align="justify" style="background: lightgrey"> </td>
									<td align="justify" style="background: lightgrey"> </td>
									<td align="justify">&#xa0;</td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="justify">&#xa0;</td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="justify">&#xa0;</td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="justify">&#xa0;</td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="justify">&#xa0;</td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="justify">&#xa0;</td>
								</tr>
								<tr>
									<td align="left">Fase 2 Estructura</td>
									<td align="justify">&#xa0;</td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="justify" style="background: lightgrey"> </td>
									<td align="justify" style="background: lightgrey"> </td>
									<td align="justify" style="background: lightgrey"> </td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="justify">&#xa0;</td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="justify">&#xa0;</td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="justify">&#xa0;</td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="justify">&#xa0;</td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="justify">&#xa0;</td>
								</tr>
								<tr>
									<td align="left">Fase 3 Envolvente Herm&#xe9;tica</td>
									<td align="justify">&#xa0;</td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="justify">&#xa0;</td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="justify" style="background: lightgrey"> </td>
									<td align="justify" style="background: lightgrey"> </td>
									<td align="justify" style="background: lightgrey"> </td>
									<td align="justify" style="background: lightgrey"> </td>
									<td align="left"> </td>
									<td align="justify">&#xa0;</td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="justify">&#xa0;</td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="justify">&#xa0;</td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="justify">&#xa0;</td>
								</tr>
								<tr>
									<td align="left">Fase 4 Pre Instalaciones</td>
									<td align="justify">&#xa0;</td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="justify">&#xa0;</td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="justify">&#xa0;</td>
									<td align="left"> </td>
									<td align="justify" style="background: lightgrey"> </td>
									<td align="justify" style="background: lightgrey"> </td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="justify">&#xa0;</td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="justify">&#xa0;</td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="justify">&#xa0;</td>
								</tr>
								<tr>
									<td align="left">Fase 5 Tabiquer&#xed;a y Aislamientos</td>
									<td align="justify">&#xa0;</td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="justify">&#xa0;</td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="justify">&#xa0;</td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="justify">&#xa0;</td>
									<td align="justify" style="background: lightgrey"> </td>
									<td align="justify" style="background: lightgrey"> </td>
									<td align="justify" style="background: lightgrey"> </td>
									<td align="justify" style="background: lightgrey"> </td>
									<td align="justify">&#xa0;</td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="justify">&#xa0;</td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="justify">&#xa0;</td>
								</tr>
								<tr>
									<td align="left">Fase 6 Carpinter&#xed;a interior</td>
									<td align="justify">&#xa0;</td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="justify">&#xa0;</td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="justify">&#xa0;</td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="justify">&#xa0;</td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="justify" style="background: lightgrey"> </td>
									<td align="justify" style="background: lightgrey"> </td>
									<td align="justify" style="background: lightgrey"> </td>
									<td align="justify" style="background: lightgrey"> </td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="left"> </td>
									<td align="justify">&#xa0;</td>
								</tr>
								<tr>
									<td align="left">Fase 7 Urbanizaci&#xf3;n</td>
									<td align="justify">&#xa0;</td>
									<td align="justify">&#xa0;</td>
									<td align="justify">&#xa0;</td>
									<td align="justify">&#xa0;</td>
									<td align="justify">&#xa0;</td>
									<td align="justify">&#xa0;</td>
									<td align="justify">&#xa0;</td>
									<td align="justify">&#xa0;</td>
									<td align="justify">&#xa0;</td>
									<td align="justify">&#xa0;</td>
									<td align="justify">&#xa0;</td>
									<td align="justify">&#xa0;</td>
									<td align="justify">&#xa0;</td>
									<td align="justify">&#xa0;</td>
									<td align="justify">&#xa0;</td>
									<td align="justify">&#xa0;</td>
									<td align="justify">&#xa0;</td>
									<td align="justify">&#xa0;</td>
									<td align="justify">&#xa0;</td>
									<td align="justify">&#xa0;</td>
									<td align="justify" style="background: lightgrey"> </td>
									<td align="justify" style="background: lightgrey"> </td>
									<td align="justify" style="background: lightgrey"> </td>
									<td align="justify" style="background: lightgrey"> </td>
								</tr>
							</tbody>
						</table>
					</table-wrap>
					<p>El plan de fases para la ejecuci&#xf3;n de una vivienda modular pasiva se establece en 26 cap&#xed;tulos y 7 hitos de comprobaci&#xf3;n.</p>
					<p>Los cap&#xed;tulos se agrupan en 7 fases y cada una de ellas est&#xe1; asociada a la verificaci&#xf3;n y comprobaci&#xf3;n de los hitos correspondientes que, sin la aprobaci&#xf3;n de los mismos por la Direcci&#xf3;n Facultativa, no se permite el proceder con las siguientes fases de ejecuci&#xf3;n de la obra.</p>
					<p>
						<bold>Pull sesion:</bold> Reuni&#xf3;n en la que cada responsable identifica los rendimientos, recursos y restricciones necesarias para comenzar y finalizar las tareas seg&#xfa;n lo planificado. La bibliograf&#xed;a al respecto menciona que lo habitual son dos pulls sesi&#xf3;n en viviendas unifamiliares (<xref ref-type="bibr" rid="B25">25</xref>) no obstante, las caracter&#xed;sticas del sistema constructivo industrializado hacen posible el organizar la totalidad de la obra &#xe1;gilmente en una &#xfa;nica sesi&#xf3;n. Por nuestra trayectoria previa ejecutando viviendas modulares sin m&#xe9;todo (tal y como se describe en la metodolog&#xed;a), disponemos de un listado de errores recurrentes y restricciones en obra, que se hacen visibles en esta reuni&#xf3;n, con el objetivo de valorar conjuntamente con el equipo de trabajo las mejores posibilidades de subsanaci&#xf3;n. Se determina la duraci&#xf3;n efectiva de cada tarea suponiendo que no habr&#xe1; restricciones y se analizan las condiciones necesarias para que cada actividad pueda ser ejecutada cumpliendo el cronograma del plan maestro.</p>
					<p>
						<bold>Look ahead:</bold> En nuestro caso establecemos una ventana de tiempo de 3 semanas vista en la secuencia de actividades, motivada por la interacci&#xf3;n de las distintas contratas trabajando conjuntamente en obra. El cumplimiento del mismo se revisa semanalmente en visita de obra, con el objetivo de que los responsables de cada tarea y &#xfa;ltimos planificadores, eval&#xfa;en el grado de avance de la anterior semana, y se comprometan a la consecuci&#xf3;n del mismo.</p>
				</sec>
				<sec id="sec3.2.3">
					<label>3.2.3</label>
					<title>Descripci&#xf3;n de la secuencia de fases y tareas</title>
					<p>La gu&#xed;a de la direcci&#xf3;n de obra, desarrolla la secuencia de actividades reales en obra implementando a su vez la metodolog&#xed;a Lean-LPS (<xref ref-type="table" rid="t2">Tabla 2</xref>).</p>
					<table-wrap id="t2">
						<label>Tabla 2</label>
						<caption>
							<title>Secuencia de fases de ejecuci&#xf3;n y par&#xe1;metros de planificaci&#xf3;n LPS definidos por los responsables.</title>
						</caption>
						<table>
							<colgroup>
								<col/>
								<col/>
								<col/>
								<col/>
								<col/>
								<col/>
							</colgroup>
							<thead>
								<tr>
									<th align="center">Fases</th>
									<th align="center">Plazo</th>
									<th align="center">Subcontratas y operarios en obra</th>
									<th align="center">Fase precedente</th>
									<th align="center">Restricci&#xf3;n para comenzar</th>
									<th align="center">Puntos cr&#xed;ticos de especial atenci&#xf3;n</th>
								</tr>
							</thead>
							<tbody>
								<tr>
									<td align="center">
										<bold>Fase 1.</bold>
										<bold>Partidas ligadas a la parcela</bold>
									</td>
									<td align="center">3 semanas </td>
									<td align="center">Obra civil (3 operarios)</td>
									<td align="center">Proyecto de ejecuci&#xf3;n</td>
									<td align="center">No disponer de suministros provisionales; abastecimiento de agua e instalaci&#xf3;n el&#xe9;ctrica</td>
									<td align="center">Nivelaci&#xf3;n de la solera, se intentar&#xe1; la m&#xe1;xima horizontalidad. &#xc1;rea de la solera, se dejar&#xe1; una holgura 2 cm.</td>
								</tr>
								<tr>
									<td align="center">
										<bold>Fase 2.</bold>
										<bold>Estructura</bold>
									</td>
									<td align="center">3 semanas </td>
									<td align="center">Montaje de estructura (4 operarios).</td>
									<td align="center">Partidas ligadas a la parcela</td>
									<td align="center">Falta de suministro de la estructura de aluminio y madera en obra.</td>
									<td align="center">Sellados con junta molecular en puntos susceptibles de la estructura. Colocaci&#xf3;n de l&#xe1;mina impermeable en la uni&#xf3;n de estructura de madera con el aluminio</td>
								</tr>
								<tr>
									<td align="center">
										<bold>Fase 3.</bold>
										<bold>Envolvente Herm&#xe9;tica</bold>
									</td>
									<td align="center">4 semanas </td>
									<td align="center">Carpinter&#xed;a de madera y Carpinter&#xed;a exterior (6 operarios)</td>
									<td align="center">Estructura</td>
									<td align="center">Mala ejecuci&#xf3;n de sellados en uniones, entre las Ls de cimentaci&#xf3;n y solera. Falta de colocaci&#xf3;n de tyvek en encuentros singulares.</td>
									<td align="center">Puntos especiales hermeticidad</td>
								</tr>
								<tr>
									<td align="center">
										<bold>Fase 4.</bold>
										<bold>Pre-instalaciones</bold>
									</td>
									<td align="center">2 semanas </td>
									<td align="center">Tabiquer&#xed;a seca e Instalaciones (6 operarios)</td>
									<td align="center">Envolvente Herm&#xe9;tica</td>
									<td align="center"> Falta de hermeticidad</td>
									<td align="center">Cruces entre conductos de climatizaci&#xf3;n y ventilaci&#xf3;n. Correcta ubicaci&#xf3;n del retorno de recuperador en la impulsi&#xf3;n del clima.</td>
								</tr>
								<tr>
									<td align="center">
										<bold>Fase 5.</bold>
										<bold>Tabiquer&#xed;a y aislamientos</bold>
									</td>
									<td align="center">4 semanas</td>
									<td align="center">Tabiquer&#xed;a seca e Instalaciones (7 operarios)</td>
									<td align="center">Pre instalaciones</td>
									<td align="center">Aclarados pasos para instalaciones</td>
									<td align="center">Colocaci&#xf3;n de aislamiento en trasdosados de cubiertas inclinadas, barrera de vapor continua en pasos instalaciones.</td>
								</tr>
								<tr>
									<td align="center">
										<bold>Fase 6.</bold>
										<bold>Carpinter&#xed;a y Acabados</bold>
									</td>
									<td align="center">4 semanas </td>
									<td align="center">Tabiquer&#xed;a seca y Carpinter&#xed;a (6 operarios)</td>
									<td align="center">Tabiquer&#xed;a y aislamientos</td>
									<td align="center">Placas de yeso laminado instaladas</td>
									<td align="center">Coordinaci&#xf3;n entre oficios; pasteado y lijado de placas de yeso, a la par de colocaci&#xf3;n de guarniciones de puertas de paso, y pavimentos.</td>
								</tr>
								<tr>
									<td align="center">
										<bold>Fase 7.</bold>
										<bold>Urbanizaci&#xf3;n</bold>
									</td>
									<td align="center">4 semanas</td>
									<td align="center">Obra civil y carpinter&#xed;a (6 operarios)</td>
									<td align="center">Carpinter&#xed;a</td>
									<td align="center">Obra recogida</td>
									<td align="center">Drenaje perimetral </td>
								</tr>
							</tbody>
						</table>
					</table-wrap>
					<p>
						<bold>FASE 1. PARTIDAS LIGADAS A LA PARCELA</bold>
					</p>
					<list list-type="simple">
						<list-item>
							<p>1.1 Acondicionamiento del terreno: desde el desbroce y limpieza del terreno, excavaci&#xf3;n hasta la cota resistente y excavaci&#xf3;n de zanjas para el paso de instalaciones.</p>
						</list-item>
						<list-item>
							<p>1.2 Cimentaci&#xf3;n: Habitualmente, se ejecutar&#xe1; una solera ventilada, de hormig&#xf3;n armado sobre encofrado perdido de m&#xf3;dulos de polipropileno tipo &#x201c;caviti&#x201d; y viga de borde de 30x50cm. Incluyendo ventilaci&#xf3;n de solera, mediante tubos de PVC 110mm y remate en T. El espesor de la solera, as&#xed; como su armado depender&#xe1; de las condiciones del terreno, siendo la m&#xe1;s habitual de un canto de 25+5.</p>
						</list-item>
						<list-item>
							<p>1.3 Instalaciones generales de parcela y red de saneamiento horizontal</p>
						</list-item>
					</list>
					<p>
						<bold>FASE 2. ESTRUCTURA</bold>
					</p>
					<list list-type="simple">
						<list-item>
							<p>2.1 Replanteo de perfiles de cimentaci&#xf3;n sobre la solera ventilada.</p>
						</list-item>
					</list>
					<p>
						<bold>Hito 1.</bold> Comprobaci&#xf3;n replanteo de perfiles de cimentaci&#xf3;n.</p>
					<list list-type="simple">
						<list-item>
							<p>2.2 Instalaci&#xf3;n Ls de cimentaci&#xf3;n, marcos estructurales y pilares madera: Se atornillar&#xe1;n a la cimentaci&#xf3;n mediante varillas roscadas. El apoyo de los pilares ser&#xe1; sobre Ls, adem&#xe1;s se proteger&#xe1;n los pies de pilares de madera mediante l&#xe1;mina impermeable.</p>
						</list-item>
						<list-item>
							<p>2.3 Cerramiento de fachada panel Walluminium: Colocaci&#xf3;n de los paneles de cerramiento de fachada, previa instalaci&#xf3;n de las juntas el&#xe1;sticas EPDM espumado y autoadhesivo, garantizando que las uniones entre los paneles sean coplanarias.</p>
						</list-item>
						<list-item>
							<p>2.4 Forjado Planta Alta: Instalaci&#xf3;n previa de las vigas de madera laminada, para proceder con la colocaci&#xf3;n de vigas de forjado OSB HB97 300 con intereje 0,60m. El forjado consta de las vigas de madera OSB y tableros superiores de 22 mm e inferiores de 15 mm, atornillados y pegados mediante adhesivo estructural formando un caj&#xf3;n indeformable. El mismo tiene car&#xe1;cter estructural, funcionando como un diafragma y dotando de rigidez al conjunto.</p>
						</list-item>
						<list-item>
							<p>2.5 Marcos estructurales de la planta alta: Impermeabilizando la uni&#xf3;n horizontal entre marcos de planta baja y planta alta</p>
						</list-item>
						<list-item>
							<p>2.6 Cubierta panel Walluminium: Nos servimos del forjado para la colocaci&#xf3;n de los paneles de cubierta. Estos paneles siempre sobresaldr&#xe1;n sobre los paneles de cerramiento entre 1 y 2 cm (permitiendo la evacuaci&#xf3;n de los canales). </p>
						</list-item>
						<list-item>
							<p>2.7 Marcos est&#xe9;ticos: En fachadas trasversales, formado por marco r&#xed;gido de aluminio de secci&#xf3;n 200x80x6.</p>
						</list-item>
						<list-item>
							<p>2.8 Colocaci&#xf3;n de los remates de cubierta: Siendo piezas de chapa plegada en L de 2 mm separada unos 2 cm del cerramiento de paneles, selladas con membrana autoadhesiva Effisus. A mayores se incluir&#xe1; cinta de EPDM espumado a modo de goter&#xf3;n que evitar&#xe1; que el agua ascienda.</p>
						</list-item>
					</list>
					<p>
						<bold>Hito 2</bold> Estructura: objetivo principal confirmar la correcta ejecuci&#xf3;n de la estructura. Estructura bien enlazada, juntas coplanarias entre paneles y verificaci&#xf3;n de puntos singulares a estanquidad. Comprobando los sellados en las uniones (ls-solera), (marcos-solera), (marcos a 45&#xba;), (marco PB y PA).</p>
					<p>
						<bold>FASE 3. ENVOLVENTE HERM&#xc9;TICA</bold>
					</p>
					<list list-type="simple">
						<list-item>
							<p>3.1 Fachadas hastiales: Fabricaci&#xf3;n en taller de los paneles opacos autoportantes de fachada, mediante cercos de madera tratada en autoclave arriostrados con tablero de OSB en sus dos caras y rellenos de 10 cm de aislamiento de lana de roca. Colocaci&#xf3;n en obra de los opacos atornillados entre los marcos estructurales. A continuaci&#xf3;n, se dispondr&#xe1; en su cara exterior de l&#xe1;mina impermeable con solape seg&#xfa;n ca&#xed;da de las aguas que envolver&#xe1;n totalmente la parte exterior y las esquinas de los paneles de madera.</p>
						</list-item>
						<list-item>
							<p>3.2 Carpinter&#xed;as exteriores: Se colocan directamente, atornilladas y selladas a los marcos estructurales dise&#xf1;ados para quedar vistos. Y solapando y sujetando la l&#xe1;mina impermeable contra los paneles autoportantes.</p>
						</list-item>
						<list-item>
							<p>3.3 Trasdosados hermeticidad: Primeramente, trasdosado de cubierta y posteriormente trasdosado de cerramiento. Se colocar&#xe1; l&#xe1;mina impermeable - transpirable con cinta doble cara, siempre solapando seg&#xfa;n la ca&#xed;da de las aguas y descolgando por fachadas al menos 10 cm. A continuaci&#xf3;n, se colocan los tableros de OSB de la cubierta atornill&#xe1;ndolos en las alas de los paneles y se presta especial atenci&#xf3;n en no perforar la l&#xe1;mina en la c&#xe1;mara ventilada. Y sell&#xe1;ndose entre s&#xed;.</p>
						</list-item>
						<list-item>
							<p>3.4 Forjados: Sobre solera de planta baja, estar&#xe1; formado por l&#xe1;mina pl&#xe1;stica anti capilaridad (film de polietileno de 0,05mm) que se llevar&#xe1; hasta la altura de las carpinter&#xed;as, sobre la que se dispondr&#xe1; un doble rastrelado de madera de pino de 80x40 cm (opcional taco de madera tratada y rastrel) panel r&#xed;gido de poliestireno extruido de espesor 16cm, y acabado superior de tablero de OSB3-22mm. Siendo el alto total de 20 cm.</p>
						</list-item>
					</list>
					<p>
						<bold>Hito 3</bold> Hermeticidad<bold>.</bold> objetivo garantizar la continuidad de una capa herm&#xe9;tica alrededor de todo el volumen calefactado. (Procede aclarar que no se trata del ensayo bloower door exigido por el est&#xe1;ndar passivhaus. Sino que se realiza una comprobaci&#xf3;n visual, que garantice la hermeticidad de las juntas de la envolvente.)</p>
					<p>
						<bold>FASE 4. PRE INSTALACIONES</bold>
					</p>
					<list list-type="simple">
						<list-item>
							<p>4.1 Montaje subestructura de placas de yeso laminado. Se prestar&#xe1; especial atenci&#xf3;n a las cotas interiores de las estancias ya que de ello depende en muchos casos el cumplimiento de la normativa de habitabilidad. Importante descontar los espesores de los materiales de revestimiento de los tabiques.</p>
						</list-item>
						<list-item>
							<p>4.2 Pre Instalaciones: Se replantean las instalaciones en concreto el correcto trazado de los conductos de climatizaci&#xf3;n y ventilaci&#xf3;n, nos aprovecharemos del paso entre las vigas de forjado HB97 300 en sentido longitudinal y teniendo especial precauci&#xf3;n siguiendo las indicaciones del fabricante si tenemos la necesidad de atravesar las mismas en sentido perpendicular.</p>
						</list-item>
					</list>
					<p>
						<bold>Hito 4</bold> Replanteo instalaciones: objetivo principal es el correcto trazado de conductos, salidas de ventilaci&#xf3;n y ubicaci&#xf3;n de los equipos, acordes a la arquitectura y a las singularidades del sistema constructivo de la edificaci&#xf3;n</p>
					<p>
						<bold>FASE 5 TABIQUER&#xcd;A Y AISLAMIENTOS</bold>
					</p>
					<list list-type="simple">
						<list-item>
							<p>5.1 Trasdosados aislamientos y barrera de vapor: Se instalar&#xe1;n los aislamientos de los trasdosados de cubiertas y cerramientos compuestos por; una primera capa de lana de roca de 100mm de espesor y una segunda capa de 65mm y barrera de vapor por la cara caliente del aislamiento rematando bien sus juntas con cinta y encuentros con instalaciones.</p>
						</list-item>
					</list>
					<p>
						<bold>Hito 5</bold> Aislamiento y Barrera de vapor: objetivo principal es la ausencia de puentes t&#xe9;rmicos, y garantizar los espesores de aislamiento descritos en proyecto, con ayuda de la c&#xe1;mara termogr&#xe1;fica para la detecci&#xf3;n de puntos fr&#xed;os, y/o posibles puentes t&#xe9;rmicos. Colocaci&#xf3;n de la BV por la cara caliente del aislamiento garantizando la continuidad de la misma.</p>
					<list list-type="simple">
						<list-item>
							<p>5.2 Colocaci&#xf3;n acabado placa de yeso: Se procede con el pasteado y lijado de las placas de yeso, seguido de las primeras manos de pintura</p>
						</list-item>
					</list>
					<p>
						<bold>FASE 6. CARPINTER&#xcd;A</bold>
					</p>
					<list list-type="simple">
						<list-item>
							<p>6.1 Pavimentos y rodapi&#xe9;s: Se procede con la instalaci&#xf3;n pavimento laminado tarima flotante sobre l&#xe1;mina de espuma de polietileno de alta densidad de 3 mm de espesor.</p>
						</list-item>
						<list-item>
							<p>6.2 Puertas de paso y mobiliario de obra: Los armarios se prefabricar&#xe1;n en taller y se instalar&#xe1;n en obra.</p>
						</list-item>
						<list-item>
							<p>6.3 Instalaci&#xf3;n del acabado final de fachada hastial</p>
						</list-item>
					</list>
					<p>
						<bold>Hito 6</bold> Prueba de instalaciones y revisi&#xf3;n acabados interiores; objetivo principal es la puesta en marcha y verificaci&#xf3;n del correcto funcionamiento de todas las instalaciones. A mayores, se realiza la revisi&#xf3;n de los acabados interiores, se fija el cumplimento de los criterios de aceptaci&#xf3;n o rechazo, y se define el listado de puntos a solventar en un plazo fijo</p>
					<p>
						<bold>FASE 7. URBANIZACI&#xd3;N</bold>
					</p>
					<list list-type="simple">
						<list-item>
							<p>7.1 Pavimentos exteriores, cierres de parcela y equipamiento exterior</p>
						</list-item>
					</list>
					<p>
						<bold>Hito 7</bold> Acabados Exteriores: Pruebas instalaciones generales de parcela y verificaci&#xf3;n acabados exteriores</p>
				</sec>
			</sec>
			<sec id="sec3.3">
				<label>3.3.</label>
				<title>Aplicaci&#xf3;n del manual</title>
				<p>Comprobaci&#xf3;n de los usos del manual en 3 obras concretas. Se muestran a continuaci&#xf3;n, la secuencia de im&#xe1;genes (<xref ref-type="fig" rid="f3 f4 f5 f6 f7 f8 f9 f10 f11 f12 f13 f14 f15 f16 f17 f18 f19 f20 f21 f22 f23">figuras 3 a la 23</xref>) de cada una de las fases que definen la puesta en obra de las mismas.</p>
				<p>
					<bold>FASE 1</bold>
				</p>
				<fig id="f3">
					<label>Figura 3</label>
					<caption>
						<title>Cimentaci&#xf3;n armados.</title>
					</caption>
					<graphic id="gra-3" xlink:href="IC-75-572-e520-gf3.png"/>
				</fig>
				<fig id="f4">
					<label>Figura 4</label>
					<caption>
						<title>Cimentaci&#xf3;n solera ventilada.</title>
					</caption>
					<graphic id="gra-4" xlink:href="IC-75-572-e520-gf4.png"/>
				</fig>
				<fig id="f5">
					<label>Figura 5</label>
					<caption>
						<title>Replanteo marcos estruct.</title>
					</caption>
					<graphic id="gra-5" xlink:href="IC-75-572-e520-gf5.png"/>
				</fig>
				<p>
					<bold>FASE 2</bold>
				</p>
				<fig id="f6">
					<label>Figura 6</label>
					<caption>
						<title>Montaje marcos estruct. PB.</title>
					</caption>
					<graphic id="gra-6" xlink:href="IC-75-572-e520-gf6.png"/>
				</fig>
				<fig id="f7">
					<label>Figura 7</label>
					<caption>
						<title>Montaje marcos PB y muros.</title>
					</caption>
					<graphic id="gra-7" xlink:href="IC-75-572-e520-gf7.png"/>
				</fig>
				<fig id="f8">
					<label>Figura 8</label>
					<caption>
						<title>Estructura y cubierta completas.</title>
					</caption>
					<graphic id="gra-8" xlink:href="IC-75-572-e520-gf8.png"/>
				</fig>
				<p>
					<bold>FASE 3</bold>
				</p>
				<fig id="f9">
					<label>Figura 9</label>
					<caption>
						<title>Colocaci&#xf3;n l&#xe1;mina impermeable en fachada hastial.</title>
					</caption>
					<graphic id="gra-9" xlink:href="IC-75-572-e520-gf9.png"/>
				</fig>
				<fig id="f10">
					<label>Figura 10</label>
					<caption>
						<title>Forjado PB.</title>
					</caption>
					<graphic id="gra-10" xlink:href="IC-75-572-e520-gf10.png"/>
				</fig>
				<fig id="f11">
					<label>Figura 11</label>
					<caption>
						<title>Trasdosados hermeticidad.</title>
					</caption>
					<graphic id="gra-11" xlink:href="IC-75-572-e520-gf11.png"/>
				</fig>
				<p>
					<bold>FASE 4</bold>
				</p>
				<fig id="f12">
					<label>Figura 12</label>
					<caption>
						<title>Replanteo instalaciones de fontaner&#xed;a electricidad y teleco.</title>
					</caption>
					<graphic id="gra-12" xlink:href="IC-75-572-e520-gf12.png"/>
				</fig>
				<fig id="f13">
					<label>Figura 13</label>
					<caption>
						<title>Replanteo conductos de climatizaci&#xf3;n y ventilaci&#xf3;n.</title>
					</caption>
					<graphic id="gra-13" xlink:href="IC-75-572-e520-gf13.png"/>
				</fig>
				<fig id="f14">
					<label>Figura 14</label>
					<caption>
						<title>Instalaci&#xf3;n el&#xe9;ctrica.</title>
					</caption>
					<graphic id="gra-14" xlink:href="IC-75-572-e520-gf14.png"/>
				</fig>
				<p>
					<bold>FASE 5</bold>
				</p>
				<fig id="f15">
					<label>Figura 15</label>
					<caption>
						<title>Lana de roca esp. 100 + 65 mm.</title>
					</caption>
					<graphic id="gra-15" xlink:href="IC-75-572-e520-gf15.png"/>
				</fig>
				<fig id="f16">
					<label>Figura 16</label>
					<caption>
						<title>Barrera de vapor continua.</title>
					</caption>
					<graphic id="gra-16" xlink:href="IC-75-572-e520-gf16.png"/>
				</fig>
				<fig id="f17">
					<label>Figura 17</label>
					<caption>
						<title>Colocaci&#xf3;n placas de yeso laminado.</title>
					</caption>
					<graphic id="gra-17" xlink:href="IC-75-572-e520-gf17.png"/>
				</fig>
				<p>
					<bold>FASE 6</bold>
				</p>
				<fig id="f18">
					<label>Figura 18</label>
					<caption>
						<title>Instalaci&#xf3;n de la escalera.</title>
					</caption>
					<graphic id="gra-18" xlink:href="IC-75-572-e520-gf18.png"/>
				</fig>
				<fig id="f19">
					<label>Figura 19</label>
					<caption>
						<title>Instalaci&#xf3;n pavimento laminado sobre l&#xe1;mina de espuma de polietileno.</title>
					</caption>
					<graphic id="gra-19" xlink:href="IC-75-572-e520-gf19.png"/>
				</fig>
				<fig id="f20">
					<label>Figura 20</label>
					<caption>
						<title>Instalaci&#xf3;n acabado de fachada.</title>
					</caption>
					<graphic id="gra-20" xlink:href="IC-75-572-e520-gf20.png"/>
				</fig>
				<p>
					<bold>FASE 7</bold>
				</p>
				<fig id="f21">
					<label>Figura 21</label>
					<caption>
						<title>Porri&#xf1;o MFR. Acabado exterior.</title>
					</caption>
					<graphic id="gra-21" xlink:href="IC-75-572-e520-gf21.png"/>
				</fig>
				<fig id="f22">
					<label>Figura 22</label>
					<caption>
						<title>Boiro CSH. Acabado exterior.</title>
					</caption>
					<graphic id="gra-22" xlink:href="IC-75-572-e520-gf22.png"/>
				</fig>
				<fig id="f23">
					<label>Figura 23</label>
					<caption>
						<title>Cangas MMG. Acabado exterior.</title>
					</caption>
					<graphic id="gra-23" xlink:href="IC-75-572-e520-gf23.png"/>
				</fig>
				<p>
					<bold>Identificaci&#xf3;n de nuevos errores detectados:</bold>
				</p>
				<p>
					<bold>Fase 2:</bold>
				</p>
				<list list-type="bullet">
					<list-item>
						<p>No dejar holgura de 20mm entre las vigas de OSB el cerramiento para disponer la l&#xe1;mina impermeable-transpirable y el tablero de trasdosado de cerramiento de OSB de 15.</p>
					</list-item>
					<list-item>
						<p>Falta de impermeabilizaci&#xf3;n en la junta horizontal entre marcos de PA y PB.</p>
					</list-item>
					<list-item>
						<p>Ausencia de junta de EPDM en la uni&#xf3;n entre los marcos de PA y el panel de cubierta.</p>
					</list-item>
					<list-item>
						<p>Paneles de cubierta sin sobresalir sobre los paneles de cerramiento entre 1 y 2 cm (para permitir la correcta evacuaci&#xf3;n de los canales). </p>
					</list-item>
					<list-item>
						<p>Remate de cornisa, sin separaci&#xf3;n de la chapa L 20 mm no permitiendo la evacuaci&#xf3;n de los canales, falta de colaci&#xf3;n o colocaci&#xf3;n en lado incorrecto de la cinta de EPDM espumado.</p>
					</list-item>
				</list>
				<p>
					<bold>Fase 3:</bold>
				</p>
				<list list-type="bullet">
					<list-item>
						<p>Colocaci&#xf3;n de la l&#xe1;mina impermeable en el trasdosado de cubierta con el solape en sentido contrario al sentido de evacuaci&#xf3;n a la ca&#xed;da de las aguas.</p>
					</list-item>
					<list-item>
						<p>Colocaci&#xf3;n de l&#xe1;mina impermeable por su cara inversa, es decir la cara impermeable no en contacto con la posible agua de condensaci&#xf3;n.</p>
					</list-item>
					<list-item>
						<p>No verificaci&#xf3;n de la c&#xe1;mara ventilada del cerramiento de panel Walluminium (tierra cota m&#xe1;s alta que la solera de cimentaci&#xf3;n)</p>
					</list-item>
					<list-item>
						<p>No colocaci&#xf3;n de chapas en remates de cubiertas con el producto apropiado de sellado molecular (effisus), sino que atornilladas, generando problemas de entrada de agua</p>
					</list-item>
					<list-item>
						<p>Colocaci&#xf3;n de l&#xe1;mina impermeable generando pliegues en las cornisas. (Problema sobretodo en cubiertas con ptes bajas)</p>
					</list-item>
				</list>
				<p>
					<bold>Fase 4:</bold>
				</p>
				<list list-type="bullet">
					<list-item>
						<p>No dejar los puntos de iluminaci&#xf3;n correctamente situados seg&#xfa;n indicaciones en los planos</p>
					</list-item>
					<list-item>
						<p>&#xcd;dem fontaner&#xed;a, en concreto falta de coordinaci&#xf3;n entre subcontratas de instalaciones y cocinas</p>
					</list-item>
					<list-item>
						<p>No dejar previsi&#xf3;n de grifer&#xed;a empotrada en duchas.</p>
					</list-item>
					<list-item>
						<p>Caudales de clima no ajustados, ni homog&#xe9;neos en todas las estancias</p>
					</list-item>
				</list>
				<p>
					<bold>Fase 5:</bold>
				</p>
				<list list-type="bullet">
					<list-item>
						<p>Montaje de subestructura de pladur, sin tener en cuenta las cotas interiores de las estancias, sin descontar los espesores de los materiales de revestimientos. Incumpliendo en ciertos casos la normativa de habitabilidad.</p>
					</list-item>
					<list-item>
						<p>No instalaci&#xf3;n de refuerzos en la subestructura de pladur, donde est&#xe1;n proyectados; lavabos suspendidos, tomas de TV y muebles altos de cocinas.</p>
					</list-item>
				</list>
				<p>
					<bold>Fase 6:</bold>
				</p>
				<list list-type="bullet">
					<list-item>
						<p>Colocaci&#xf3;n de tableros de madera cemento en la zona de agua, de espesor superior al que se necesita (m&#xe1;s de 8mm) generado juntas grandes, muy visibles.</p>
					</list-item>
					<list-item>
						<p>Puertas de paso, sin holgura de 15 mm impidiendo la circulaci&#xf3;n del aire de retorno bajo las mismas.</p>
					</list-item>
				</list>
			</sec>
			<sec id="sec3.4">
				<label>3.4.</label>
				<title>Optimizaci&#xf3;n del manual de direcci&#xf3;n de obra</title>
				<p>Se corrigen los errores detectados durante la aplicaci&#xf3;n del manual, se define un nuevo listado de restricciones, sobre el que se trabaja conjuntamente, para disponer de las soluciones consensuadas con antelaci&#xf3;n. As&#xed; como, se establecen partidas que se pueden optimizar con un mayor grado de industrializaci&#xf3;n en taller. Y se generan los check list de comprobaci&#xf3;n de hitos, para seguir un exhaustivo registro de las partidas y puntos singulares a verificar. </p>
				<p>Procede aclarar que cada hito, no es un hito de cumplimento de tiempo, sino de comprobaci&#xf3;n y verificaci&#xf3;n de los indicadores de calidad y sostenibilidad, y a su vez su cumplimiento, establece un eje com&#xfa;n transversal sobre los par&#xe1;metros tiempo y coste.</p>
				<p>
					<bold>Calidad de la construcci&#xf3;n;</bold> asegurando el cumplimiento de las caracter&#xed;sticas particulares del sistema constructivo. Se determina m&#xe1;s concretamente con la verificaci&#xf3;n de los hitos:</p>
				<p>Replanteo de perfiles de cimentaci&#xf3;n, Estructura y Replanteo de instalaciones.</p>
				<p>
					<bold>Sostenibilidad de la edificaci&#xf3;n,</bold> cumplimento de los requisitos de una edificaci&#xf3;n pasiva, y se determina m&#xe1;s concretamente con la verificaci&#xf3;n de los hitos: Hermeticidad, Aislamiento y BV y Prueba de instalaciones.</p>
				<p>
					<bold>Tiempo y coste.</bold> En el cumplimiento de todos los hitos existe una relaci&#xf3;n directa, con los par&#xe1;metros de tiempo y coste, sin desv&#xed;os en obra. Puesto que la correcci&#xf3;n de partidas en cualquiera de los anteriores implicar&#xed;a un desv&#xed;o en el plazo y en el presupuesto total de la obra. </p>
				<p>Cabe se&#xf1;alar, que otro de los factores importante en beneficio de la productividad, es el trabajar regularmente con las mismas subcontratas, optimizando la planificaci&#xf3;n y la consecuci&#xf3;n de los hitos de verificaci&#xf3;n.</p>
			</sec>
		</sec>
		<sec id="sec4" sec-type="results|discussion">
			<label>4.</label>
			<title>Resultados y discusi&#xf3;n</title>
			<p>El resultado de la aplicaci&#xf3;n del m&#xe9;todo optimizado de direcci&#xf3;n de obra, es la consecuci&#xf3;n de la mejora continua de las obras, y por consiguiente del manual, que se retroalimenta de la experiencia real adquirida en cada puesta en obra. </p>
			<p>Gracias a la gu&#xed;a, se ha garantizado la mejora de la productividad y eficiencia durante la etapa de ejecuci&#xf3;n de las edificaciones modulares pasivas. En concreto, los resultados porcentuales en la mejora de la productividad han sido calculados respecto a los datos previos a la construcci&#xf3;n de viviendas modulares de similar envergadura sin seguir este m&#xe9;todo de direcci&#xf3;n de obra. </p>
			<p>
				<bold>Par&#xe1;metro tiempo</bold>: Se constata tal y como le sucedi&#xf3; a Del Solar et al., 2021 (<xref ref-type="bibr" rid="B24">24</xref>) que, el trabajar la planificaci&#xf3;n con todos los integrantes del equipo, conlleva un gran resultado, consiguiendo finalizar la ejecuci&#xf3;n de las obras con antelaci&#xf3;n al calendario fijado inicialmente. Lo que supuso, una reducci&#xf3;n de plazo en un 26 %. Pasando de un plazo de ejecuci&#xf3;n de 6 meses a 5 meses y 2 semanas. No obstante, cabe se&#xf1;alar que se tuvieron en cuenta estimaciones de tiempo incorrectas en la planificaci&#xf3;n de fases inicial, motivadas por el desconocimiento de los subcontratistas en llevar a cabo la ejecuci&#xf3;n de algunas partidas por falta de experiencias previas, y por lo tanto surgieron desv&#xed;os en la duraci&#xf3;n de la fase a la que pertenec&#xed;an. Al igual que explica en su investigaci&#xf3;n Del Solar et al., 2021 (<xref ref-type="bibr" rid="B24">24</xref>) siendo destacable, que, gracias a un mayor grado de industrializaci&#xf3;n, conseguimos subsanar y mejorar otros plazos, eliminando el desv&#xed;o total sobre el cronograma y alcance del plan maestro.</p>
			<p>
				<bold>Par&#xe1;metro coste:</bold> Se ha alcanzado una mejor&#xed;a del 16% respecto a los desv&#xed;os de presupuesto, valor similar al porcentaje promedio que destacan en la literatura Zimina et al.,2021 (<xref ref-type="bibr" rid="B40">40</xref>). Constatamos que, la incorporaci&#xf3;n de la metodolog&#xed;a productiva ha garantizado costes m&#xe1;s competitivos, tal y como indica Hernando Castro, 2013 (<xref ref-type="bibr" rid="B41">41</xref>). As&#xed; como consideramos de gran ayuda, para abaratar costes, la utilizaci&#xf3;n de herramientas espec&#xed;ficas de simulaci&#xf3;n e informaci&#xf3;n Building information modeling durante la redacci&#xf3;n del proyecto, con un alto nivel de definici&#xf3;n facilitando en gran medida la compresi&#xf3;n de todos los agentes involucrados, y mejorado la aplicaci&#xf3;n del m&#xe9;todo de direcci&#xf3;n de obra. Que junto a la metodolog&#xed;a LPS, tal y como destacan las publicaciones de referencia (<xref ref-type="bibr" rid="B14">14</xref>, <xref ref-type="bibr" rid="B41">41</xref>), favorecieron a su vez el cumplimento de los hitos y entregas. </p>
			<p>
				<bold>Par&#xe1;metro calidad</bold>: Destacamos una mejora considerable en la calidad de la ejecuci&#xf3;n, sin necesidad de rehacer o subsanar partidas, respecto a las construcciones modulares pasivas construidas con anterioridad a la aplicaci&#xf3;n del m&#xe9;todo de direcci&#xf3;n de obra. Disminuyendo en un 80% los errores recurrentes. As&#xed; que, como defini&#xf3; Koskela, 2000 (<xref ref-type="bibr" rid="B20">20</xref>) con la aplicaci&#xf3;n de los principios base de Lean Construction conseguimos mejorar la productividad y la eficiencia de la construcci&#xf3;n, y por lo tanto, aumentar la calidad final, tal y como ha sucedido en nuestros casos reales con la aplicaci&#xf3;n del m&#xe9;todo de direcci&#xf3;n de obra. No obstante, es leg&#xed;timo comentar, que ha surgido alguna nueva incidencia, debido a recientes singularidades en los encuentros constructivos, derivadas de la flexibilidad del sistema.</p>
			<p>Se ha conseguido la mejora continua del proceso de construcci&#xf3;n, conllevando a una mejora de competitividad dentro de nuestro sector, en lo que coincidimos con la revisi&#xf3;n de literatura de Hernando Castro, 2013 (<xref ref-type="bibr" rid="B41">41</xref>), que explica que la implantaci&#xf3;n de metodolog&#xed;a Lean en el proceso productivo de diferentes industrias, constata una mejora continua del proceso que promueve la competitividad y productividad. Tal y como concluyeron Kunz &amp; Fischer, 2020, (<xref ref-type="bibr" rid="B42">42</xref>) la integraci&#xf3;n de diversos m&#xe9;todos en un mismo proyecto y obra, dotan de un valor a&#xf1;adido, muy superior a su uso por separado en la pr&#xe1;ctica de la industria de la Arquitectura-Ingenier&#xed;a-Construcci&#xf3;n (AEC). En nuestro caso, a&#xf1;adimos los criterios de la arquitectura pasiva, y un elevado nivel de prefabricaci&#xf3;n de calidad. Formulando un m&#xe9;todo integrado revolucionario, que dota, por consecuencia de un valor a&#xf1;adido el proceso de construcci&#xf3;n, en el que se atiende simult&#xe1;neamente a; exigentes requisitos de sostenibilidad, metodolog&#xed;a Lean-LPS, y un alto grado de industrializaci&#xf3;n. </p>
			<p>
				<bold>Par&#xe1;metro sostenibilidad:</bold> El uso del m&#xe9;todo ofrece claros resultados, garantizando el cumplimento del est&#xe1;ndar passivhauss (<xref ref-type="bibr" rid="B26">26</xref>, <xref ref-type="bibr" rid="B27">27</xref>) gracias a una correcta puesta en obra, proporcionando una evidencia clara, de forma similar que en la investigaci&#xf3;n de R. Mitchell y S. Natarajan, 2020 (<xref ref-type="bibr" rid="B29">29</xref>) donde el cumplimiento del est&#xe1;ndar ofrece hogares de bajo consumo de energ&#xed;a, sin brecha de rendimiento, que son asequibles para calentar sin la necesidad de m&#xe9;tricas complejas. En nuestro caso concreto, se identific&#xf3; una brecha de rendimiento de desviaci&#xf3;n m&#xed;nima entre las medidas de &#x201c;como se dise&#xf1;&#xf3;&#x201d; a &#x201c;c&#xf3;mo se construy&#xf3;&#x201d;, tal y como concluyeron en sus estudios Moreno-Rangel, 2020 (<xref ref-type="bibr" rid="B43">43</xref>). A su vez, los ensayos determinaron, que se logra una bajada considerablemente de la demanda energ&#xe9;tica, aumentando a su vez, la temperatura superficial interior de la envolvente, en especial de las ventanas, al igual que sucede en el estudio de Hatt et al., 2012 (<xref ref-type="bibr" rid="B44">44</xref>). Y coincidimos con Bruscato et al., 2011 (<xref ref-type="bibr" rid="B45">45</xref>), en el logro de un proceso de dise&#xf1;o integrado, &#x201c;estrategia que pretende promover una arquitectura m&#xe1;s sustentable a trav&#xe9;s de la colaboraci&#xf3;n multidisciplinaria temprana&#x201d;. En la aplicaci&#xf3;n de nuestro m&#xe9;todo, para alcanzar un mejor desempe&#xf1;o ambiental del edificio, ha destacado la importancia de la coordinaci&#xf3;n del trabajo y el equilibrio de intereses del equipo.</p>
		</sec>
		<sec id="sec5" sec-type="conclusions">
			<label>5.</label>
			<title>Conclusiones</title>
			<p>La novedad del estudio reside en la creaci&#xf3;n de un nuevo m&#xe9;todo de direcci&#xf3;n de obra para construcciones modulares pasivas organizado y viable, que se fundamenta en la mejora de la productividad a trav&#xe9;s de la eficiencia de la puesta en obra. La aplicaci&#xf3;n del manual se ha limitado a obras de tipolog&#xed;a unifamiliar exenta en clima c&#xe1;lido templado, ejecutadas con sistema constructivo modular ligero. Para ello se han utilizado 3 muestras representativas localizadas en las R&#xed;as Baixas con un radio de acci&#xf3;n de 50 km. </p>
			<p>En concreto, se ha demostrado que con el cumplimiento los 7 hitos fijados a lo largo de la ejecuci&#xf3;n y a su vez la aprobaci&#xf3;n de los check list de cada hito por la direcci&#xf3;n facultativa, garantizan la mejora de los indicadores de productividad, &#x201c;plazo, coste, calidad y sostenibilidad&#x201d; respecto a la ejecuci&#xf3;n de viviendas sin la aplicaci&#xf3;n de este m&#xe9;todo.</p>
			<p>Se confirma que la gu&#xed;a de direcci&#xf3;n de obra para viviendas modulares y ecoeficientes, no es el resultado de la aplicaci&#xf3;n de la metodolog&#xed;a Lean, sino que es la creaci&#xf3;n de un m&#xe9;todo adaptado las caracter&#xed;sticas espec&#xed;ficas de las CML pasivas y m&#xe1;s concretamente a las particularidades sistema constructivo industrializado e innovador objeto de esta investigaci&#xf3;n.</p>
			<p>Tal y como explic&#xe1;bamos en la introducci&#xf3;n de este art&#xed;culo, confirmamos que con la aplicaci&#xf3;n del m&#xe9;todo cumplimos los nuevos est&#xe1;ndares de eficiencia energ&#xe9;tica establecidos por la Uni&#xf3;n Europea, Near Zero Energy Buliding (nZEB) (<xref ref-type="bibr" rid="B12">12</xref>, <xref ref-type="bibr" rid="B13">13</xref>). Creando viviendas de consumo energ&#xe9;tico casi nulo, con un excelente comportamiento ambiental y baja demanda de energ&#xed;a. </p>
			<p>Se constata una mejor&#xed;a clara en el grado de industrializaci&#xf3;n, adelantando la producci&#xf3;n de las partidas en taller de los elementos en serie, y optimizando las partidas al m&#xe1;ximo para su posterior ensamblaje. Ayudando a mejorar la calidad, y estableciendo un ahorro muy significativo del plazo. Todo ello produciendo tan pocos residuos como nos es posible, estimando en menos de un 15% los desperdicios respecto a la construcci&#xf3;n convencional (<xref ref-type="bibr" rid="B39">39</xref>). </p>
			<p>
				<bold>Futuras l&#xed;neas de investigaci&#xf3;n:</bold> m&#xe9;todo para la direcci&#xf3;n de obra en otras ubicaciones de la geograf&#xed;a nacional, ejecutadas con un sistema constructivo modular ligero con certificaci&#xf3;n Passivhaus para clima templado (<xref ref-type="bibr" rid="B46">46</xref>). </p>
		</sec>
	</body>
	<back>
		<ack>
			<title>Agradecimientos</title>
			<p>Queremos agradecer al Consejo General de la Arquitectura T&#xe9;cnica de Espa&#xf1;a (CGATE) su apoyo.</p>
		</ack>
		<ref-list>
			<title>Referencias</title>
			<ref id="B1">
				<label>(1)</label>
				<mixed-citation publication-type="journal">
					<person-group person-group-type="author">
						<string-name>
							<surname>Lim</surname>
							<given-names>Y. W.</given-names>
						</string-name>
						<string-name>
							<surname>Ling</surname>
							<given-names>P. C.</given-names>
						</string-name>
						<string-name>
							<surname>Tan</surname>
							<given-names>C. S.</given-names>
						</string-name>
						<string-name>
							<surname>Chong</surname>
							<given-names>H. Y.</given-names>
						</string-name>
						<string-name>
							<surname>Thurairajah</surname>
							<given-names>A.</given-names>
						</string-name>
					</person-group>
					<year>2022</year>
					<article-title>Planning and coordination of modular construction</article-title>
					<source>Automation in Construction</source>
					<volume>141</volume>
					<elocation-id>104455</elocation-id>
					<pub-id pub-id-type="doi">10.1016/j.autcon.2022.104455</pub-id>
				</mixed-citation>
			</ref>
			<ref id="B2">
				<label>(2)</label>
				<mixed-citation publication-type="journal">
					<person-group person-group-type="author">
						<string-name>
							<surname>Roque</surname>
							<given-names>E.</given-names>
						</string-name>
						<string-name>
							<surname>Oliveira</surname>
							<given-names>R.</given-names>
						</string-name>
						<string-name>
							<surname>Almeida</surname>
							<given-names>R. M.</given-names>
						</string-name>
						<string-name>
							<surname>Vicente</surname>
							<given-names>R.</given-names>
						</string-name>
						<string-name>
							<surname>Figueiredo</surname>
							<given-names>A.</given-names>
						</string-name>
					</person-group>
					<year>2020</year>
					<article-title>Lightweight and prefabricated construction as a path to energy efficient buildings: Thermal design and execution challenges</article-title>
					<source>International Journal of Environment and Sustainable Development</source>
					<volume>19</volume>
					<issue>1</issue>
					<fpage>1</fpage>
					<lpage>32</lpage>
					<pub-id pub-id-type="doi">10.1504/IJESD.2020.105465</pub-id>
				</mixed-citation>
			</ref>
			<ref id="B3">
				<label>(3)</label>
				<mixed-citation publication-type="journal">
					<person-group person-group-type="author">
						<string-name>
							<surname>Badir</surname>
							<given-names>Y. F.</given-names>
						</string-name>
						<string-name>
							<surname>Kadir</surname>
							<given-names>M. A.</given-names>
						</string-name>
						<string-name>
							<surname>Hashim</surname>
							<given-names>A. H.</given-names>
						</string-name>
					</person-group>
					<year>2002</year>
					<article-title>Industrialized building systems construction in Malaysia</article-title>
					<source>Journal of architectural engineering</source>
					<volume>8</volume>
					<issue>1</issue>
					<fpage>19</fpage>
					<lpage>23</lpage>
					<pub-id pub-id-type="doi">10.1061/(ASCE)1076-0431(2002)8:1(19)</pub-id>
				</mixed-citation>
			</ref>
			<ref id="B4">
				<label>(4)</label>
				<mixed-citation publication-type="journal">
					<person-group person-group-type="author">
						<string-name>
							<surname>Kasperzyk</surname>
							<given-names>C.</given-names>
						</string-name>
						<string-name>
							<surname>Kim</surname>
							<given-names>M. K.</given-names>
						</string-name>
						<string-name>
							<surname>Brilakis</surname>
							<given-names>I.</given-names>
						</string-name>
					</person-group>
					<year>2017</year>
					<article-title>Automated re-prefabrication system for buildings using robotics</article-title>
					<source>Automation in Construction</source>
					<volume>83</volume>
					<fpage>184</fpage>
					<lpage>195</lpage>
					<pub-id pub-id-type="doi">10.1016/j.autcon.2017.08.002</pub-id>
				</mixed-citation>
			</ref>
			<ref id="B5">
				<label>(5)</label>
				<mixed-citation publication-type="journal">
					<person-group person-group-type="author">
						<string-name>
							<surname>R&#xf6;ck</surname>
							<given-names>M.</given-names>
						</string-name>
						<string-name>
							<surname>Ruschi Mendes Saade</surname>
							<given-names>M.</given-names>
						</string-name>
						<string-name>
							<surname>Balouktsi</surname>
							<given-names>M.</given-names>
						</string-name>
						<string-name>
							<surname>Nygaard</surname>
							<given-names>F.</given-names>
						</string-name>
						<string-name>
							<surname>Birgisdottir</surname>
							<given-names>H.</given-names>
						</string-name>
						<string-name>
							<surname>Frischknecht</surname>
							<given-names>R.</given-names>
						</string-name>
						<string-name>
							<surname>Habert</surname>
							<given-names>G.</given-names>
						</string-name>
						<string-name>
							<surname>L&#xfc;tzkendorf</surname>
							<given-names>T.</given-names>
						</string-name>
					</person-group>
					<year>2019</year>
					<article-title>Embodied GHG emissions of buildings-The hidden challenge for e ff ective climate change mitigation</article-title>
					<source>Appl. Energy</source>
					<volume>258</volume>
					<elocation-id>114107</elocation-id>
					<pub-id pub-id-type="doi">10.1016/j.apenergy.2019.114107</pub-id>
				</mixed-citation>
			</ref>
			<ref id="B6">
				<label>(6)</label>
				<mixed-citation publication-type="journal">
					<person-group person-group-type="author">
						<string-name>
							<surname>Agudelo</surname>
							<given-names>H. A.</given-names>
						</string-name>
						<string-name>
							<surname>Hern&#xe1;ndez</surname>
							<given-names>A. V.</given-names>
						</string-name>
						<string-name>
							<surname>Cardona</surname>
							<given-names>D. A. R.</given-names>
						</string-name>
					</person-group>
					<year>2012</year>
					<article-title>Sostenibilidad: Actualidad y necesidad en el sector de la construcci&#xf3;n en Colombia</article-title>
					<source>Gesti&#xf3;n y ambiente</source>
					<volume>15</volume>
					<issue>1</issue>
					<fpage>105</fpage>
					<lpage>117</lpage>
				</mixed-citation>
			</ref>
			<ref id="B7">
				<label>(7)</label>
				<mixed-citation publication-type="journal">
					<person-group person-group-type="author">
						<string-name>
							<surname>Waisman</surname>
							<given-names>H.</given-names>
						</string-name>
						<string-name>
							<surname>De Coninck</surname>
							<given-names>H.</given-names>
						</string-name>
						<string-name>
							<surname>Rogelj</surname>
							<given-names>J.</given-names>
						</string-name>
					</person-group>
					<year>2019</year>
					<article-title>Key technological enablers for ambitious climate goals: Insights from the IPCC special report on global warming of 1.5 C</article-title>
					<source>Environmental Research Letters</source>
					<volume>14</volume>
					<issue>11</issue>
					<elocation-id>111001</elocation-id>
					<pub-id pub-id-type="doi">10.1088/1748-9326/ab4c0b</pub-id>
				</mixed-citation>
			</ref>
			<ref id="B8">
				<label>(8)</label>
				<mixed-citation publication-type="journal">
					<person-group person-group-type="author">
						<string-name>
							<surname>Santamouris</surname>
							<given-names>M.</given-names>
						</string-name>
						<string-name>
							<surname>Kolokotsa</surname>
							<given-names>D.</given-names>
						</string-name>
					</person-group>
					<year>2013</year>
					<article-title>Passive cooling dissipation techniques for buildings and other structures: The state of the art</article-title>
					<source>Energy and Buildings</source>
					<volume>57</volume>
					<fpage>74</fpage>
					<lpage>94</lpage>
					<pub-id pub-id-type="doi">10.1016/j.enbuild.2012.11.002</pub-id>
				</mixed-citation>
			</ref>
			<ref id="B9">
				<label>(9)</label>
				<mixed-citation publication-type="webpage">
					<source>Horizon, E. C.</source>
					<year>2020</year>
					<ext-link ext-link-type="uri" xlink:href="https://ec.europa.eu/programmes/horizon2020">https://ec.europa.eu/programmes/horizon2020</ext-link>
				</mixed-citation>
			</ref>
			<ref id="B10">
				<label>(10)</label>
				<mixed-citation publication-type="legal-doc">
					<person-group person-group-type="author">
						<string-name>
							<surname>Europeo</surname>
							<given-names>P.</given-names>
						</string-name>
					</person-group>
					<year>2002</year>
					<source>Directiva 2002/91/CE del Parlamento Europeo y del Consejo de 16 de diciembre de 2002 relativa a la Eficiencia Energ&#xe9;tica de los Edificios</source>
					<publisher-name>Oficina de Publicaciones Oficiales de las Comunidades Europeas</publisher-name>
				</mixed-citation>
			</ref>
			<ref id="B11">
				<label>(11)</label>
				<mixed-citation publication-type="legal-doc">
					<person-group person-group-type="author">
						<collab>Europeo, P.</collab>
					</person-group>
					<year>2010</year>
					<source>Directiva 2010/31/UE del Parlamento Europeo y del Consejo, de 19 de mayo de 2010, relativa a la eficiencia energ&#xe9;tica de los edificios</source>
				</mixed-citation>
			</ref>
			<ref id="B12">
				<label>(12)</label>
				<mixed-citation publication-type="journal">
					<person-group person-group-type="author">
						<string-name>
							<surname>Mohamed</surname>
							<given-names>A.</given-names>
						</string-name>
						<string-name>
							<surname>Hasan</surname>
							<given-names>A.</given-names>
						</string-name>
						<string-name>
							<surname>Sir&#xe9;n</surname>
							<given-names>K.</given-names>
						</string-name>
					</person-group>
					<year>2014</year>
					<article-title>Fulfillment of net-zero energy building (NZEB) with four metrics in a single family house with different heating alternatives</article-title>
					<source>Applied Energy</source>
					<volume>114</volume>
					<fpage>385</fpage>
					<lpage>399</lpage>
					<pub-id pub-id-type="doi">10.1016/j.apenergy.2013.09.065</pub-id>
				</mixed-citation>
			</ref>
			<ref id="B13">
				<label>(13)</label>
				<mixed-citation publication-type="journal">
					<person-group person-group-type="author">
						<string-name>
							<surname>Magrini</surname>
							<given-names>A.</given-names>
						</string-name>
						<string-name>
							<surname>Lentini</surname>
							<given-names>G.</given-names>
						</string-name>
						<string-name>
							<surname>Cuman</surname>
							<given-names>S.</given-names>
						</string-name>
						<string-name>
							<surname>Bodrato</surname>
							<given-names>A.</given-names>
						</string-name>
						<string-name>
							<surname>Marenco</surname>
							<given-names>L.</given-names>
						</string-name>
					</person-group>
					<year>2020</year>
					<article-title>From nearly zero energy buildings (NZEB) to positive energy buildings (PEB): The next challenge-The most recent European trends with some notes on the energy analysis of a forerunner PEB example</article-title>
					<source>Developments in the Built Environment</source>
					<volume>3</volume>
					<elocation-id>100019</elocation-id>
					<pub-id pub-id-type="doi">10.1016/j.dibe.2020.100019</pub-id>
				</mixed-citation>
			</ref>
			<ref id="B14">
				<label>(14)</label>
				<mixed-citation publication-type="journal">
					<person-group person-group-type="author">
						<string-name>
							<surname>Uriz</surname>
							<given-names>A. L.</given-names>
						</string-name>
						<string-name>
							<surname>Sanz</surname>
							<given-names>C.</given-names>
						</string-name>
						<string-name>
							<surname>S&#xe1;nchez</surname>
							<given-names>B.</given-names>
						</string-name>
					</person-group>
					<year>2019</year>
					<article-title>Aplicaci&#xf3;n de un modelo Lean-BIM para la mejora de la productividad en redacci&#xf3;n de proyectos de edificaci&#xf3;n</article-title>
					<source>Informes de la Construcci&#xf3;n</source>
					<volume>71</volume>
					<issue>556</issue>
					<elocation-id>e313</elocation-id>
					<pub-id pub-id-type="doi">10.3989/ic.67222</pub-id>
				</mixed-citation>
			</ref>
			<ref id="B15">
				<label>(15)</label>
				<mixed-citation publication-type="journal">
					<person-group person-group-type="author">
						<string-name>
							<surname>Heigermoser</surname>
							<given-names>D.</given-names>
						</string-name>
						<string-name>
							<surname>de Soto</surname>
							<given-names>B. G.</given-names>
						</string-name>
						<string-name>
							<surname>Abbott</surname>
							<given-names>E. L. S.</given-names>
						</string-name>
						<string-name>
							<surname>Chua</surname>
							<given-names>D. K. H.</given-names>
						</string-name>
					</person-group>
					<year>2019</year>
					<article-title>BIM-based Last Planner System tool for improving construction project management</article-title>
					<source>Automation in Construction</source>
					<volume>104</volume>
					<fpage>246</fpage>
					<lpage>254</lpage>
					<pub-id pub-id-type="doi">10.1016/j.autcon.2019.03.019</pub-id>
				</mixed-citation>
			</ref>
			<ref id="B16">
				<label>(16)</label>
				<mixed-citation publication-type="book">
					<person-group person-group-type="author">
						<string-name>
							<surname>Koskela</surname>
							<given-names>L.</given-names>
						</string-name>
					</person-group>
					<year>1992</year>
					<source>Application of the new production philosophy to construction</source>
					<volume>72</volume>
					<fpage>39</fpage>
					<publisher-loc>Stanford</publisher-loc>
					<publisher-name>Stanford university</publisher-name>
				</mixed-citation>
			</ref>
			<ref id="B17">
				<label>(17)</label>
				<mixed-citation publication-type="journal">
					<person-group person-group-type="author">
						<string-name>
							<surname>Ballard</surname>
							<given-names>G.</given-names>
						</string-name>
						<string-name>
							<surname>Howell</surname>
							<given-names>G.</given-names>
						</string-name>
					</person-group>
					<year>1994</year>
					<article-title>Implementing lean construction: stabilizing work flow</article-title>
					<source>Lean construction</source>
					<volume>2</volume>
					<fpage>105</fpage>
					<lpage>114</lpage>
				</mixed-citation>
			</ref>
			<ref id="B18">
				<label>(18)</label>
				<mixed-citation publication-type="confproc">
					<person-group person-group-type="author">
						<string-name>
							<surname>Hamzeh</surname>
							<given-names>F. R.</given-names>
						</string-name>
						<string-name>
							<surname>Ballard</surname>
							<given-names>G.</given-names>
						</string-name>
						<string-name>
							<surname>Tommelein</surname>
							<given-names>I. D.</given-names>
						</string-name>
					</person-group>
					<source>Improving construction workflow-the connective role of lookahead planning</source>
					<conf-name>Proceedings for the 16th annual conference of the International Group for Lean Construction</conf-name>
					<conf-date>2008, July</conf-date>
					<fpage>635</fpage>
					<lpage>646</lpage>
					<pub-id pub-id-type="doi">10.13140/RG.2.1.3804.3685</pub-id>
				</mixed-citation>
			</ref>
			<ref id="B19">
				<label>(19)</label>
				<mixed-citation publication-type="journal">
					<person-group person-group-type="author">
						<string-name>
							<surname>Hoyos</surname>
							<given-names>M. F.</given-names>
						</string-name>
						<string-name>
							<surname>Botero</surname>
							<given-names>L. F.</given-names>
						</string-name>
					</person-group>
					<year>2018</year>
					<article-title>Evolution and global impact of the Last Planner System: a literature review</article-title>
					<source>Ingenier&#xed;a y Desarrollo</source>
					<volume>36</volume>
					<issue>1</issue>
					<fpage>187</fpage>
					<lpage>214</lpage>
					<pub-id pub-id-type="doi">10.14482/inde.36.1.10946</pub-id>
				</mixed-citation>
			</ref>
			<ref id="B20">
				<label>(20)</label>
				<mixed-citation publication-type="book">
					<person-group person-group-type="author">
						<string-name>
							<surname>Koskela</surname>
							<given-names>L.</given-names>
						</string-name>
					</person-group>
					<year>2000</year>
					<source>An exploration towards a production theory and its application to construction</source>
					<publisher-name>VTT Technical Research Centre of Finland</publisher-name>
				</mixed-citation>
			</ref>
			<ref id="B21">
				<label>(21)</label>
				<mixed-citation publication-type="journal">
					<person-group person-group-type="author">
						<string-name>
							<surname>Porwal</surname>
							<given-names>V.</given-names>
						</string-name>
						<string-name>
							<surname>Fern&#xe1;ndez-Sol&#xed;s</surname>
							<given-names>J.</given-names>
						</string-name>
						<string-name>
							<surname>Lavy</surname>
							<given-names>S.</given-names>
						</string-name>
						<string-name>
							<surname>Rybkowski</surname>
							<given-names>Z. K.</given-names>
						</string-name>
					</person-group>
					<year>2010</year>
					<article-title>Last planner system implementation challenges</article-title>
					<source>Production Planning and Control</source>
					<fpage>10</fpage>
				</mixed-citation>
			</ref>
			<ref id="B22">
				<label>(22)</label>
				<mixed-citation publication-type="journal">
					<person-group person-group-type="author">
						<string-name>
							<surname>Fernandez-Solis</surname>
							<given-names>J. L.</given-names>
						</string-name>
						<string-name>
							<surname>Porwal</surname>
							<given-names>V.</given-names>
						</string-name>
						<string-name>
							<surname>Lavy</surname>
							<given-names>S.</given-names>
						</string-name>
						<string-name>
							<surname>Shafaat</surname>
							<given-names>A.</given-names>
						</string-name>
						<string-name>
							<surname>Rybkowski</surname>
							<given-names>Z. K.</given-names>
						</string-name>
						<string-name>
							<surname>Son</surname>
							<given-names>K.</given-names>
						</string-name>
						<string-name>
							<surname>Lagoo</surname>
							<given-names>N.</given-names>
						</string-name>
					</person-group>
					<year>2013</year>
					<article-title>Survey of motivations, benefits, and implementation challenges of last planner system users</article-title>
					<source>Journal of construction engineering and management</source>
					<volume>139</volume>
					<issue>4</issue>
					<fpage>354</fpage>
					<lpage>360</lpage>
					<pub-id pub-id-type="doi">10.1061/(ASCE)CO.1943-7862.0000606</pub-id>
				</mixed-citation>
			</ref>
			<ref id="B23">
				<label>(23)</label>
				<mixed-citation publication-type="journal">
					<person-group person-group-type="author">
						<string-name>
							<surname>Kalsaas</surname>
							<given-names>B. T.</given-names>
						</string-name>
					</person-group>
					<year>2012</year>
					<article-title>The Last Planner System Style of Planning: Its Basis in Learning Theory</article-title>
					<source>Journal of Engineering, Project &amp; Production Management</source>
					<volume>2</volume>
					<issue>2</issue>
				</mixed-citation>
			</ref>
			<ref id="B24">
				<label>(24)</label>
				<mixed-citation publication-type="journal">
					<person-group person-group-type="author">
						<string-name>
							<surname>del Solar</surname>
							<given-names>P.</given-names>
						</string-name>
						<string-name>
							<surname>del Rio</surname>
							<given-names>M.</given-names>
						</string-name>
						<string-name>
							<surname>Fuente</surname>
							<given-names>R.</given-names>
						</string-name>
						<string-name>
							<surname>Esteban</surname>
							<given-names>C.</given-names>
						</string-name>
					</person-group>
					<year>2021</year>
					<article-title>Herramientas de trabajo colaborativo en el sector de la construcci&#xf3;n espa&#xf1;ol. Buenas pr&#xe1;cticas para la implementaci&#xf3;n de la metodolog&#xed;a &#x201c;&#xda;ltimo Planificador (LPS)&#x201d;</article-title>
					<source>Informes de la Construcci&#xf3;n</source>
					<volume>73</volume>
					<issue>561</issue>
					<elocation-id>e383</elocation-id>
					<pub-id pub-id-type="doi">10.3989/ic.77475</pub-id>
				</mixed-citation>
			</ref>
			<ref id="B25">
				<label>(25)</label>
				<mixed-citation publication-type="book">
					<person-group person-group-type="author">
						<string-name>
							<surname>Pons Achell</surname>
							<given-names>J. F.</given-names>
						</string-name>
						<string-name>
							<surname>Rubio P&#xe9;rez</surname>
							<given-names>I.</given-names>
						</string-name>
					</person-group>
					<year>2019</year>
					<source>Lean Construction y la planificaci&#xf3;n colaborativa. Metodolog&#xed;a del Last Planner&#xae; System</source>
					<publisher-name>Consejo General de la Arquitectura T&#xe9;cnica de Espa&#xf1;a</publisher-name>
					<abbrev>CGATE</abbrev>
				</mixed-citation>
			</ref>
			<ref id="B26">
				<label>(26)</label>
				<mixed-citation publication-type="journal">
					<person-group person-group-type="author">
						<string-name>
							<surname>Feist</surname>
							<given-names>W.</given-names>
						</string-name>
						<string-name>
							<surname>Schnieders</surname>
							<given-names>J.</given-names>
						</string-name>
						<string-name>
							<surname>Dorer</surname>
							<given-names>V.</given-names>
						</string-name>
						<string-name>
							<surname>Haas</surname>
							<given-names>A.</given-names>
						</string-name>
					</person-group>
					<year>2005</year>
					<article-title>Re-inventing air heating: Convenient and comfortable within the frame of the Passive House concept</article-title>
					<source>Energy and buildings</source>
					<volume>37</volume>
					<issue>11</issue>
					<fpage>1186</fpage>
					<lpage>1203</lpage>
					<pub-id pub-id-type="doi">10.1016/j.enbuild.2005.06.020</pub-id>
				</mixed-citation>
			</ref>
			<ref id="B27">
				<label>(27)</label>
				<mixed-citation publication-type="book">
					<person-group person-group-type="author">
						<string-name>
							<surname>Gantioler</surname>
							<given-names>G.</given-names>
						</string-name>
					</person-group>
					<year>2010</year>
					<source>Manual para la certificaci&#xf3;n &#x201c;Est&#xe1;ndar Passivhaus&#x201d; CERTIFICADO Est&#xe1;ndar Passivhaus Dr. <italic>Wolfgang Feist</italic>
					</source>
					<version>Versi&#xf3;n del, 23</version>
				</mixed-citation>
			</ref>
			<ref id="B28">
				<label>(28)</label>
				<mixed-citation publication-type="journal">
					<person-group person-group-type="author">
						<string-name>
							<surname>Linhares</surname>
							<given-names>P.</given-names>
						</string-name>
						<string-name>
							<surname>Hermo</surname>
							<given-names>V.</given-names>
						</string-name>
						<string-name>
							<surname>Meire</surname>
							<given-names>C.</given-names>
						</string-name>
					</person-group>
					<year>2021</year>
					<article-title>Environmental design guidelines for residential NZEBs with liner tray construction</article-title>
					<source>Journal of Building Engineering</source>
					<volume>42</volume>
					<elocation-id>102580</elocation-id>
					<pub-id pub-id-type="doi">10.1016/j.jobe.2021.102580</pub-id>
				</mixed-citation>
			</ref>
			<ref id="B29">
				<label>(29)</label>
				<mixed-citation publication-type="journal">
					<person-group person-group-type="author">
						<string-name>
							<surname>Mitchell</surname>
							<given-names>R.</given-names>
						</string-name>
						<string-name>
							<surname>Natarajan</surname>
							<given-names>S.</given-names>
						</string-name>
					</person-group>
					<year>2020</year>
					<article-title>UK Passivhaus and the energy performance gap</article-title>
					<source>Energy and Buildings</source>
					<volume>224</volume>
					<elocation-id>110240</elocation-id>
					<pub-id pub-id-type="doi">10.1016/j.enbuild.2020.110240</pub-id>
				</mixed-citation>
			</ref>
			<ref id="B30">
				<label>(30)</label>
				<mixed-citation publication-type="journal">
					<person-group person-group-type="author">
						<string-name>
							<surname>De Wilde</surname>
							<given-names>P.</given-names>
						</string-name>
					</person-group>
					<year>2014</year>
					<article-title>The gap between predicted and measured energy performance of buildings: A framework for investigation</article-title>
					<source>Automation in construction</source>
					<volume>41</volume>
					<fpage>40</fpage>
					<lpage>49</lpage>
					<pub-id pub-id-type="doi">10.1016/j.autcon.2014.02.009</pub-id>
				</mixed-citation>
			</ref>
			<ref id="B31">
				<label>(31)</label>
				<mixed-citation publication-type="thesis">
					<person-group person-group-type="author">
						<string-name>
							<surname>Hermo</surname>
							<given-names>V.</given-names>
						</string-name>
					</person-group>
					<year>2011</year>
					<source>Sistema constructivo industrializado in situ COTaCERO: transferencia tecnol&#xf3;gica: construcci&#xf3;n de dep&#xf3;sitos-ejecuci&#xf3;n de viviendas en altura mediante paneles portantes de acero</source>
				</mixed-citation>
			</ref>
			<ref id="B32">
				<label>(32)</label>
				<mixed-citation publication-type="book">
					<person-group person-group-type="author">
						<string-name>
							<surname>Valc&#xe1;rcel</surname>
							<given-names>J. P.</given-names>
						</string-name>
						<string-name>
							<surname>Hermo</surname>
							<given-names>V.</given-names>
						</string-name>
						<string-name>
							<surname>Cheda</surname>
							<given-names>J. B. R.</given-names>
						</string-name>
					</person-group>
					<year>2013</year>
					<chapter-title>Un nuevo sistema constructivo: Aspectos estructurales del sistema COTaCERO</chapter-title>
					<person-group person-group-type="editor">
						<string-name>
							<surname>Valc&#xe1;rcel</surname>
							<given-names>J. P.</given-names>
						</string-name>
						<string-name>
							<surname>Hermo</surname>
							<given-names>V.</given-names>
						</string-name>
						<string-name>
							<surname>Rodriguez Cheda</surname>
							<given-names>J. B.</given-names>
						</string-name>
					</person-group>
					<source>Estructuras y Arquitectura</source>
					<fpage>1097</fpage>
					<lpage>1104</lpage>
					<publisher-name>Prensa CRC</publisher-name>
					<pub-id pub-id-type="doi">10.1201/b15267-149</pub-id>
				</mixed-citation>
			</ref>
			<ref id="B33">
				<label>(33)</label>
				<mixed-citation publication-type="patent">
					<person-group person-group-type="author">
						<string-name>
							<surname>Rodr&#xed;guez Cheda</surname>
							<given-names>J. B.</given-names>
						</string-name>
						<string-name>
							<surname>P&#xe9;rez-Valc&#xe1;rcel</surname>
							<given-names>J.</given-names>
						</string-name>
						<string-name>
							<surname>Hermo</surname>
							<given-names>V.</given-names>
						</string-name>
					</person-group>
					<year>2011</year>
					<source>M&#xe9;todo para construir edificaciones de varias plantas mediante paneles portantes ligeros desde el nivel del terreno</source>
					<patent country="ES">2370438</patent>
				</mixed-citation>
			</ref>
			<ref id="B34">
				<label>(34)</label>
				<mixed-citation publication-type="journal">
					<person-group person-group-type="author">
						<string-name>
							<surname>P&#xe9;rez-Valc&#xe1;rcel</surname>
							<given-names>J.</given-names>
						</string-name>
						<string-name>
							<surname>Mu&#xf1;oz-Vidal</surname>
							<given-names>M.</given-names>
						</string-name>
						<string-name>
							<surname>Hermo</surname>
							<given-names>V.</given-names>
						</string-name>
					</person-group>
					<year>2020</year>
					<article-title>Construcci&#xf3;n izada: Condicionantes estructurales del sistema REVERSTOP</article-title>
					<source>Informes de la Construcci&#xf3;n</source>
					<volume>72</volume>
					<issue>559</issue>
					<elocation-id>e355</elocation-id>
					<pub-id pub-id-type="doi">10.3989/ic.72993</pub-id>
				</mixed-citation>
			</ref>
			<ref id="B35">
				<label>(35)</label>
				<mixed-citation publication-type="patent">
					<person-group person-group-type="author">
						<string-name>
							<surname>Hermo</surname>
							<given-names/>
						</string-name>
					</person-group>
					<year>2015</year>
					<source>Estructura modular para la construcci&#xf3;n de edificaciones</source>
					<patent country="ES">ES 2 716 889 B2 OE PM 2015</patent>
					<comment>n.d</comment>
				</mixed-citation>
			</ref>
			<ref id="B36">
				<label>(36)</label>
				<mixed-citation publication-type="book">
					<person-group person-group-type="author">
						<string-name>
							<surname>Pons Achell</surname>
							<given-names>J. F.</given-names>
						</string-name>
					</person-group>
					<year>2014</year>
					<source>Introducci&#xf3;n a lean Construction Fundaci&#xf3;n Laboral de la Construcci&#xf3;n</source>
					<fpage>74</fpage>
					<ext-link ext-link-type="uri" xlink:href="http://www.fundacionlaboral.org/documento/introduccion-al-lean-construction">http://www.fundacionlaboral.org/documento/introduccion-al-lean-construction</ext-link>
				</mixed-citation>
			</ref>
			<ref id="B37">
				<label>(37)</label>
				<mixed-citation publication-type="journal">
					<person-group person-group-type="author">
						<string-name>
							<surname>Hastak</surname>
							<given-names>M.</given-names>
						</string-name>
					</person-group>
					<year>1998</year>
					<article-title>Advanced automation or conventional construction process?</article-title>
					<source>Automation in construction</source>
					<volume>7</volume>
					<issue>4</issue>
					<fpage>299</fpage>
					<lpage>314</lpage>
					<pub-id pub-id-type="doi">10.1016/S0926-5805(98)00047-8</pub-id>
				</mixed-citation>
			</ref>
			<ref id="B38">
				<label>(38)</label>
				<mixed-citation publication-type="journal">
					<person-group person-group-type="author">
						<string-name>
							<surname>Qi</surname>
							<given-names>B.</given-names>
						</string-name>
						<string-name>
							<surname>Razkenari</surname>
							<given-names>M.</given-names>
						</string-name>
						<string-name>
							<surname>Costin</surname>
							<given-names>A.</given-names>
						</string-name>
						<string-name>
							<surname>Kibert</surname>
							<given-names>C.</given-names>
						</string-name>
						<string-name>
							<surname>Fu</surname>
							<given-names>M.</given-names>
						</string-name>
					</person-group>
					<year>2021</year>
					<article-title>A systematic review of emerging technologies in industrialized construction</article-title>
					<source>Journal of building engineering</source>
					<volume>39</volume>
					<elocation-id>102265</elocation-id>
					<pub-id pub-id-type="doi">10.1016/j.jobe.2021.102265</pub-id>
				</mixed-citation>
			</ref>
			<ref id="B39">
				<label>(39)</label>
				<mixed-citation publication-type="journal">
					<person-group person-group-type="author">
						<string-name>
							<surname>Begum</surname>
							<given-names>R. A.</given-names>
						</string-name>
						<string-name>
							<surname>Satari</surname>
							<given-names>S. K.</given-names>
						</string-name>
						<string-name>
							<surname>Pereira</surname>
							<given-names>J. J.</given-names>
						</string-name>
					</person-group>
					<year>2010</year>
					<article-title>Waste generation and recycling: Comparison of conventional and industrialized building systems</article-title>
					<source>American Journal of Environmental Sciences</source>
					<volume>6</volume>
					<issue>4</issue>
					<elocation-id>383</elocation-id>
					<pub-id pub-id-type="doi">10.3844/ajessp.2010.383.388</pub-id>
				</mixed-citation>
			</ref>
			<ref id="B40">
				<label>(40)</label>
				<mixed-citation publication-type="journal">
					<person-group person-group-type="author">
						<string-name>
							<surname>Zimina</surname>
							<given-names>D.</given-names>
						</string-name>
						<string-name>
							<surname>Ballard</surname>
							<given-names>G.</given-names>
						</string-name>
						<string-name>
							<surname>Pasquire</surname>
							<given-names>C.</given-names>
						</string-name>
					</person-group>
					<year>2012</year>
					<article-title>Target value design: using collaboration and a lean approach to reduce construction cost</article-title>
					<source>Construction management and economics</source>
					<volume>30</volume>
					<issue>5</issue>
					<fpage>383</fpage>
					<lpage>398</lpage>
					<pub-id pub-id-type="doi">10.1080/01446193.2012.676658</pub-id>
				</mixed-citation>
			</ref>
			<ref id="B41">
				<label>(41)</label>
				<mixed-citation publication-type="thesis">
					<person-group person-group-type="author">
						<string-name>
							<surname>Hernando Castro</surname>
							<given-names>S. M.</given-names>
						</string-name>
					</person-group>
					<year>2013</year>
					<source>Transferencia e integraci&#xf3;n de metodolog&#xed;a industrial innovadora en la producci&#xf3;n de viviendas</source>
					<comment content-type="degree">Doctoral dissertation, Arquitectura</comment>
					<pub-id pub-id-type="doi">10.20868/UPM.thesis.19878</pub-id>
				</mixed-citation>
			</ref>
			<ref id="B42">
				<label>(42)</label>
				<mixed-citation publication-type="book">
					<person-group person-group-type="author">
						<string-name>
							<surname>Fischer</surname>
							<given-names>M.</given-names>
						</string-name>
						<string-name>
							<surname>Drogemuller</surname>
							<given-names>R.</given-names>
						</string-name>
					</person-group>
					<year>2009</year>
					<chapter-title>Virtual design and construction</chapter-title>
					<source>Technology, design and process innovation in the built environment</source>
					<fpage>319</fpage>
					<lpage>344</lpage>
					<publisher-name>Spon Press</publisher-name>
					<pub-id pub-id-type="doi">10.1080/01446193.2020.1714068</pub-id>
				</mixed-citation>
			</ref>
			<ref id="B43">
				<label>(43)</label>
				<mixed-citation publication-type="journal">
					<person-group person-group-type="author">
						<string-name>
							<surname>Moreno-Rangel</surname>
							<given-names>A.</given-names>
						</string-name>
					</person-group>
					<year>2020</year>
					<article-title>Passivhaus</article-title>
					<source>Encyclopedia</source>
					<volume>1</volume>
					<issue>1</issue>
					<fpage>20</fpage>
					<lpage>29</lpage>
					<pub-id pub-id-type="doi">10.3390/encyclopedia1010005</pub-id>
				</mixed-citation>
			</ref>
			<ref id="B44">
				<label>(44)</label>
				<mixed-citation publication-type="journal">
					<person-group person-group-type="author">
						<string-name>
							<surname>Hatt</surname>
							<given-names>T.</given-names>
						</string-name>
						<string-name>
							<surname>Saelzer</surname>
							<given-names>G.</given-names>
						</string-name>
						<string-name>
							<surname>Hempel</surname>
							<given-names>R.</given-names>
						</string-name>
						<string-name>
							<surname>Gerber</surname>
							<given-names>A.</given-names>
						</string-name>
					</person-group>
					<year>2012</year>
					<article-title>High indoor comfort and very low energy consumption through the implementation of the Passive House standard in</article-title>
					<source>Revista de la Construcci&#xf3;n</source>
					<volume>12</volume>
				</mixed-citation>
			</ref>
			<ref id="B45">
				<label>(45)</label>
				<mixed-citation publication-type="journal">
					<person-group person-group-type="author">
						<string-name>
							<surname>Bruscato</surname>
							<given-names>U. M.</given-names>
						</string-name>
						<string-name>
							<surname>Alvarado</surname>
							<given-names>R. G.</given-names>
						</string-name>
						<string-name>
							<surname>Oyola</surname>
							<given-names>O. E.</given-names>
						</string-name>
						<string-name>
							<surname>Kelly</surname>
							<given-names>M. T.</given-names>
						</string-name>
						<string-name>
							<surname>Damico</surname>
							<given-names>F. C.</given-names>
						</string-name>
					</person-group>
					<year>2011</year>
					<article-title>Dise&#xf1;o integrado para viviendas energ&#xe9;ticamente eficientes en Chile: Enhebrando capacidades</article-title>
					<source>H&#xe1;bitat Sustentable</source>
					<fpage>2</fpage>
					<lpage>13</lpage>
				</mixed-citation>
			</ref>
			<ref id="B46">
				<label>(46)</label>
				<mixed-citation publication-type="journal">
					<person-group person-group-type="author">
						<string-name>
							<surname>Yakimchuk</surname>
							<given-names>T.</given-names>
						</string-name>
						<string-name>
							<surname>Linhares</surname>
							<given-names>P.</given-names>
						</string-name>
						<string-name>
							<surname>Hermo</surname>
							<given-names>V.</given-names>
						</string-name>
					</person-group>
					<year>2023</year>
					<article-title>Evaluation of a modular construction system in accordance with the Passivhaus standard for components</article-title>
					<source>Journal of Building Engineering</source>
					<volume>76</volume>
					<elocation-id>107234</elocation-id>
					<pub-id pub-id-type="doi">10.1016/j.jobe.2023.107234</pub-id>
				</mixed-citation>
			</ref>
		</ref-list>
	</back>
</article>