Environmental control teams, an advance stage on the environmental protection
DOI:
https://doi.org/10.3989/ic.1993.v45.i425-426.1181Abstract
It is felt in a general way that environmental considerations must be part of all stages when defining projects of infrastructure and public works, with different degrees of intensity depending on which stage: first, we deal with the regional planning; in a more advanced stage the environmental impact assessment takes place; and finally, a plan of corrective and revegetation measures is prepared. Now, it would be necessary to generalize the presence of environmental controlling vigilant teams to supervise the correct application of the corrective and revegetation measures during the construction of big public works.
Downloads
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 1993 Consejo Superior de Investigaciones Científicas (CSIC)

This work is licensed under a Creative Commons Attribution 4.0 International License.
© CSIC. Manuscripts published in both the print and online versions of this journal are the property of the Consejo Superior de Investigaciones Científicas, and quoting this source is a requirement for any partial or full reproduction.
All contents of this electronic edition, except where otherwise noted, are distributed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence. You may read the basic information and the legal text of the licence. The indication of the CC BY 4.0 licence must be expressly stated in this way when necessary.
Self-archiving in repositories, personal webpages or similar, of any version other than the final version of the work produced by the publisher, is not allowed.