Malta Dam – Austria
DOI:
https://doi.org/10.3989/ic.1975.v28.i275.2824Abstract
The Malta Dam consists of three consecutive units, united by means of pressure galleries. The upper and the lower steps are balancing tanks with a capacity of 1,800,000 and 500,000 m2, respectively. The middle step is a great vaulted dam of 200 m height, of 200 million m2 capacity, with a crest length of 600 m, and is therefore one of the largest dams in the world of its kind. This hydroelectric group will be able to provide annually approximately 900 million kW/h, by using exclusively the natural flow of the river Malta and its tributaries. For the construction of this power plant, various additional installations were necessary, such as for instance: the preparation of the quarry for the extraction of the aggregates; transport systems for the aggregates and the concrete; living quarters for approximately 700 workers, kitchen, dining-rooms, lounges, work-shops and storage rooms; purification plants and water supply installation; and finally, the numerous access roads to all the working areas.
Downloads
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 1975 Consejo Superior de Investigaciones Científicas (CSIC)

This work is licensed under a Creative Commons Attribution 4.0 International License.
© CSIC. Manuscripts published in both the print and online versions of this journal are the property of the Consejo Superior de Investigaciones Científicas, and quoting this source is a requirement for any partial or full reproduction.
All contents of this electronic edition, except where otherwise noted, are distributed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence. You may read the basic information and the legal text of the licence. The indication of the CC BY 4.0 licence must be expressly stated in this way when necessary.
Self-archiving in repositories, personal webpages or similar, of any version other than the final version of the work produced by the publisher, is not allowed.