This paper describes the connecting conduit between the Atazar Canal, which finishes at the El Goloso reservoir, and the water distribution network of Madrid, whose reservoir is at the Plaza de Castilla. The main features of this conduit are: the initial stage of the conduit, the pipe itself, the valves and the final stage of the conduit. Work has been done quickly, and the use of one of the pipes saved Madrid from undergoing strong water restrictions during the summer months. The project was adjudicated by auction, and the price estimate was about 500 million pesetas, which gives some idea of the magnitude of the enterprise.
Downloads
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 1967 Consejo Superior de Investigaciones Científicas (CSIC)

This work is licensed under a Creative Commons Attribution 4.0 International License.
© CSIC. Manuscripts published in both the print and online versions of this journal are the property of the Consejo Superior de Investigaciones Científicas, and quoting this source is a requirement for any partial or full reproduction.
All contents of this electronic edition, except where otherwise noted, are distributed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence. You may read the basic information and the legal text of the licence. The indication of the CC BY 4.0 licence must be expressly stated in this way when necessary.
Self-archiving in repositories, personal webpages or similar, of any version other than the final version of the work produced by the publisher, is not allowed.