Salto Grande dam - Argentina – Uruguay
DOI:
https://doi.org/10.3989/ic.1979.v32.i316.2390Abstract
The power harnessing of Salto Grande will be the first common project carried out by two South American Countries and this will foster greater integration of both countries. The project involves the following: — One 39 m-high dam — Two hydroelectric power plants — One international bridge — One shipping canal The benefits to be obtained from the project include: increase and improvement of the waterway network; increase of electricity production; railways and highway tie-ups between both countries; industrial development; increased availability of irrigation water; new tourist resorts; increase of fishing resources.
Downloads
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 1979 Consejo Superior de Investigaciones Científicas (CSIC)

This work is licensed under a Creative Commons Attribution 4.0 International License.
© CSIC. Manuscripts published in both the print and online versions of this journal are the property of the Consejo Superior de Investigaciones Científicas, and quoting this source is a requirement for any partial or full reproduction.
All contents of this electronic edition, except where otherwise noted, are distributed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence. You may read the basic information and the legal text of the licence. The indication of the CC BY 4.0 licence must be expressly stated in this way when necessary.
Self-archiving in repositories, personal webpages or similar, of any version other than the final version of the work produced by the publisher, is not allowed.