Saint-André-de-Cubzac and Angers bridges – France
DOI:
https://doi.org/10.3989/ic.1978.v30.i297.2606Abstract
The development of the technique of prefabricated voussoir bridges during the past years has been made possible by the progress achieved in various fields which are developed here, namely: 1) the improvement of the joint between arch stones by the adoption of multiplenotch joints where the adhesive plays a less important part, 2) the increase ín the cross dimensions of the voussoirs as well as in their unit weight, which reduces the number of joints, as well as the diversification of the forms, which can lead to the elimination of the cross prestress, 3) the improvement of the methods of placing and of the design of the lifting rigs: mobile lifting equipement carried by the deck, launching girder. The study of these different factors is supplemented and illustrated by the presentation of two recent works: the freeway bridges of Saint-André-de-Cubzac and the bridge on the Loire near Angers.
Downloads
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 1978 Consejo Superior de Investigaciones Científicas (CSIC)

This work is licensed under a Creative Commons Attribution 4.0 International License.
© CSIC. Manuscripts published in both the print and online versions of this journal are the property of the Consejo Superior de Investigaciones Científicas, and quoting this source is a requirement for any partial or full reproduction.
All contents of this electronic edition, except where otherwise noted, are distributed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence. You may read the basic information and the legal text of the licence. The indication of the CC BY 4.0 licence must be expressly stated in this way when necessary.
Self-archiving in repositories, personal webpages or similar, of any version other than the final version of the work produced by the publisher, is not allowed.