A Relationship Framework for Building Information Modeling (BIM) Capability in Quantity Surveying Practice and Project Performance
DOI:
https://doi.org/10.3989/ic.15.007Keywords:
Building information modeling (BIM), quantity surveyors, capability, project performance, relationship frameworkAbstract
Construction industry has suffered from poor project performance and it’s crucial to find out solution to improve this issue. Quantity surveyors (QSs) play a key role in managing project cost. However, their method of performing tasks is tedious till affect the project performance. Building information modeling (BIM) application is attaining attention in the construction industry as a mean to improve the project performance. However, the adoption is low among QSs due to limited study of the BIM’s capabilities in their profession. This research aims to identify the BIM capabilities in quantity surveying practices and examine its relationship with project performance by developing a relationship framework. Data were collected through questionnaire survey and interview in Malaysia. Questionnaire results revealed that several BIM capabilities were significantly correlated with project performance and they were validated through interview. The relationship framework will guide QSs to focus on the identified BIM capabilities for better project outcomes.
Downloads
References
(1) Chan, D. W. M., Kumaraswamy, M. M. (1997). A comparative study of causes of time overruns in Hong Kong construction projects. International Journal of Project Management, 15(1): 55-63. http://dx.doi.org/10.1016/S0263-7863(96)00039-7
(2) Sun, M., Meng, X. (2009). Taxonomy for change causes and effects in construction projects. International Journal of Project Management, 27(6): 560-572. http://dx.doi.org/10.1016/j.ijproman.2008.10.005
(3) Meng, X. (2012). The effect of relationship management on project performance in construction. International Journal of Project Management, 30(2): 188-198. http://dx.doi.org/10.1016/j.ijproman.2011.04.002
(4) Olatunji, O. A., Sher, W., Gu, N. (2010). Building Information Modeling and Quantity Surveying Practice. Emirates Journal for Engineering Research, 15(1): 67-70.
(5) Al-Reshaid, K., Kartam, N., Tewari, N., Al-Bader, H. (2005). A project control process in pre-construction phases: Focus on effective methodology. Engineering, Construction and Architectural Management, 12(4): 351-372. http://dx.doi.org/10.1108/09699980510608811
(6) Gibson, J., Hamilton, M. (1994). Analysis of pre-project planning effort and success variables for capital facility projects. Austin, TX: Construction Industry Institute.
(7) Mitchell, D. (2012). 5D BIM: Creating Cost Certainty and Better Buildings. In 2012 RICS Cobra Conference, Las Vegas, Nevada USA.
(8) Hannon, J. J. (2007). Estimators' functional role change with BIM. AACE International Transactions, 1-8.
(9) Nagalingam, G., Jayasena, H. S., Ranadewa, K. (2013, 14-15 June). Building Information Modelling and Future Quantity Surveyor's Practice in Sri Lankan Construction Industry. In Second World Construction Symposium 2013: Socio-Economic Sustainability in Construction (pp. 81-92). Colombo, Sri Lanka.
(10) Ho, T. (2012). Divisional News & Activities. Quantity Surveying Division: Chairman's Message. http://www.hkis.org.hk/en/st/ST2012/201203/2012st03_5f_qsd.pdf.
(11) RICS. (2012). Building Information Modeling Survey Report. Royal Institution of Chartered Surveyors. http://www.scan2bim.info/files/rics_2011_BIM_Survey_Report.pdf.
(12) Pittard, S. (2011). BIM concept and impact. http://www.isurv.com/site/scripts/documents_info.aspx?documentID=6183&categoryID=390.
(13) Smith, P. (2014). BIM & the 5D project cost manager. Procedia-Social and Behavioral Sciences, 119: 475-484. http://dx.doi.org/10.1016/j.sbspro.2014.03.053
(14) Thurairajah, N., Goucher, D. (2012, 26-29 June). Usability and impact of BIM on early estimation practices: a cost consultant's perspective. In International Congress on Construction Management Research (pp. 555-570). Montreal, Canada.
(15) Matipa, W. M., Cunningham, P., Naik, B. (2010, 6-8 September). Assessing the impact of new rules of cost planning on building information model (BIM) schema pertinent to quantity surveying practice. In Procs 26th Annual ARCOM Conference (pp. 625-632). Leeds, UK.
(16) Stanley, R., Thurnell, D. (2014). The benefits of, and barriers to, implementation of 5D BIM for quantity surveying in New Zealand. Australasian Journal of Construction Economics and Building, 14(1):105-117. http://dx.doi.org/10.5130/ajceb.v14i1.3786
(17) Cheung, F. K. T., Rihan, J., Tah, J., Duce, D., Kurul, E. (2012). Early stage multi-level cost estimation for schematic BIM models. Automation in Construction, 27: 67-77. http://dx.doi.org/10.1016/j.autcon.2012.05.008
(18) Monteiro, A., and Poças Martins, J. (2013). A survey on modeling guidelines for quantity takeoff-oriented BIM-based design. Automation in Construction, 35: 238-253. http://dx.doi.org/10.1016/j.autcon.2013.05.005
(19) Elbeltagi, E., Hosny, O., Dawood, M., Elhakeem, A. (2014). BIM-based cost estimation/ monitoring for building construction. International Journal of Engineering Research and Applications, 4(7): 56-66.
(20) Lee, S. K., Kim, K. R., Yu, J. H. (2014). BIM and ontology-based approach for building cost estimation. Automation in Construction, 41: 96-105. http://dx.doi.org/10.1016/j.autcon.2013.10.020
(21) Staub-French, S., Fisher, M., Kunz, J., and Paulson, A. (2003). A generic feature-driven activity-based cost estimation process. Advance Engineering Informatics, 17(1): 23-39. http://dx.doi.org/10.1016/S1474-0346(03)00017-X
(22) Ma, Z. L., Wei, Z. H., Song, W., Lou, Z. (2011). Application and extension of the IFC standard in construction cost estimating for tendering in China. Automation in Construction, 20(2):196-204. http://dx.doi.org/10.1016/j.autcon.2010.09.017
(23) Nour, M., Hosny, O., Elhakeem, A. (2012). A BIM based energy and lifecycle cost analysis/optimization approach. International Journal of Engineering Research and Applications, 2(6): 411-418.
(24) Wang, X. Y., Yung, P., Luo, H.B., Truijens, M. (2014). An innovative method for project control in LNG project through 5D CAD: A case study. Automation in Construction, 45: 126-135. http://dx.doi.org/10.1016/j.autcon.2014.05.011
(25) Bryman, A., Bell, E. (2007). Business research methods (2nd ed.): Oxford University Press.
(26) Creswell, J. W. (2009). Research design: Qualitative, quantitative, and mixed methods approaches (3rd ed.): SAGE Publications, Incorporated.
(27) Toor, S., Ogunlana, S. O. (2010). Beyond the 'iron triangle': Stakeholder perception of key performance indicators (KPIs) for large-scale public sector development projects. International Journal of Project Management, 28(3): 228-236. http://dx.doi.org/10.1016/j.ijproman.2009.05.005
(28) Creswell, J. W. (2005). Educational research: Planning, conducting, and evaluating quantitative and qualitative research (second ed.). New Jersey: Pearson Merrill Prentice Hall.
(29) Field, A. (2009). Discovering statistics using SPSS. Sage publications.
(30) Gee, C. 2010. The influence of building information modeling on the quantity surveying profession. (Unpublished academic exercise). South Africa: Built Environment and Information Technology.
(31) Burns & McDonnell. (2008). Seeing the future: BIM. Benchmark, 3: 7-8.
(32) Ghanem, A. A., Wilson, N. (2011, 6-9 April). Building information modelling applied on a major csu capital project: A success story. In 47th ASC Annual International Conference (pp. 2007-2012). University of Nebraska-Lincoln, Omaha, NE.
(33) Jiang, X. (2011). Developments in cost estimating and scheduling in BIM technology (Unpublished Master's thesis). Boston, MA: Northeastern University.
(34) Shen, Z., Issa, R. R. A. (2010). Quantitative evaluation of the BIM-assisted construction detailed cost estimates. Journal of Information Technology in Construction, 15: 234-257.
(35) Hsu, R. L. (2004). Potential efficiency gains in the construction industry from the proper use of information technology (Unpublished master's thesis). Cambridge, MA: Massachusetts Institute of Technology.
(36) Aibinu, A. A., Venkatesh, S. (2012, 26-29 June). The rocky road to BIM adoption: quantity surveyors perspectives. In CIB Joint International Conference on Management of construction: research to practice (pp. 539-554). Montreal, Canada.
Published
How to Cite
Issue
Section
License
Copyright (c) 2015 Consejo Superior de Investigaciones Científicas (CSIC)

This work is licensed under a Creative Commons Attribution 4.0 International License.
© CSIC. Manuscripts published in both the print and online versions of this journal are the property of the Consejo Superior de Investigaciones Científicas, and quoting this source is a requirement for any partial or full reproduction.
All contents of this electronic edition, except where otherwise noted, are distributed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence. You may read the basic information and the legal text of the licence. The indication of the CC BY 4.0 licence must be expressly stated in this way when necessary.
Self-archiving in repositories, personal webpages or similar, of any version other than the final version of the work produced by the publisher, is not allowed.