A procedure for works and building continuous balancement
DOI:
https://doi.org/10.3989/ic.1992.v44.i419.1337Abstract
This new procedure allows not only balancing the portion of a work as it is built but also doing this operation once the work has been finished and it is in full use. Basically, the procedure consists of pre-tautening the foundations on which the load of the structure is going to be supported and keeping added to the reckoned load the ones received by each support without bearing in mind either any ground alteration or the load distribution within the building. In order to achieve this, we have taken the necessary steps, a summary of which is shown below.
Downloads
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 1992 Consejo Superior de Investigaciones Científicas (CSIC)

This work is licensed under a Creative Commons Attribution 4.0 International License.
© CSIC. Manuscripts published in both the print and online versions of this journal are the property of the Consejo Superior de Investigaciones Científicas, and quoting this source is a requirement for any partial or full reproduction.
All contents of this electronic edition, except where otherwise noted, are distributed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence. You may read the basic information and the legal text of the licence. The indication of the CC BY 4.0 licence must be expressly stated in this way when necessary.
Self-archiving in repositories, personal webpages or similar, of any version other than the final version of the work produced by the publisher, is not allowed.