Railway crossings: driving the structure under the railway by means of oleodinamic jacks

Authors

  • Ramón Escribano Méndez RENFE
  • Rafael López Palomar RENFE
  • Andrés J. Ruiz Viedma ATROS

DOI:

https://doi.org/10.3989/ic.1991.v42.i411.1405

Abstract


"The best level crossing is a dead crossing", those involved are accustomed to say Yet, until a short time ago, eliminating these conflictive crossings not only implied a great deal of money but prolonged building work, with the all too familiar sequel of precautions, speed restrictions and problems for rail traffic. However, a brand new system, based on using hydraulic jacks to drive the concrete structure of the crossing to a different level in the track embankment, allows the execution in a few weeks of what before took long months. Use of this new method acquires great importance, especially if one considers that 200 km/hour tracks virtually cannot have crossings at the same level.

Downloads

Download data is not yet available.

Downloads

Published

1991-02-28

How to Cite

Escribano Méndez, R., López Palomar, R., & Ruiz Viedma, A. J. (1991). Railway crossings: driving the structure under the railway by means of oleodinamic jacks. Informes De La Construcción, 42(411), 33–43. https://doi.org/10.3989/ic.1991.v42.i411.1405

Issue

Section

Research Articles