High-roads: omission of lanscape
DOI:
https://doi.org/10.3989/ic.1990.v42.i409.1429Abstract
In the present work is mentioned the great task that it is realizing to improve and to increase the road net. It is advised like the program is accomplished with a serious injury for nature, sometimes irreversible. The situation is analized and the question is examined in the different phases of these great public works. The different circumstances are suggested: unreasonable pressure in the achievement; project without environment consideration; wrong environment impact evaluation; performance's achievement with total neglect for nature; poor works of the restoration and improvement of the deteriorated area; disregard with integration of the work into the landscape; deficient or inadequated conservation plan of the area to restore.
Downloads
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 1990 Consejo Superior de Investigaciones Científicas (CSIC)

This work is licensed under a Creative Commons Attribution 4.0 International License.
© CSIC. Manuscripts published in both the print and online versions of this journal are the property of the Consejo Superior de Investigaciones Científicas, and quoting this source is a requirement for any partial or full reproduction.
All contents of this electronic edition, except where otherwise noted, are distributed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence. You may read the basic information and the legal text of the licence. The indication of the CC BY 4.0 licence must be expressly stated in this way when necessary.
Self-archiving in repositories, personal webpages or similar, of any version other than the final version of the work produced by the publisher, is not allowed.







