Construction of prefabricated railway underpasses and execution of the same using the thrust or driven-in cassion technique
DOI:
https://doi.org/10.3989/ic.1989.v41.i403.1478Abstract
"The best level crossing is a dead crossing", those involved are accustomed to say. Yet, until a short time ago, eliminating these conflictive crossings not only implied a great deal of money but prolonged building work, with the all too familiar sequel of precautions, speed restrictions and problems for rail traffic. However, a brand new system, based on using hydraulic jacks to drive the concrete structure of the crossing to a different level in the track embankment, allows the execution in a few weeks of what before took long months. Use of this new method acquires great importance, especially if one considers that 200 km/hour tracks virtually cannot have crossings at the same level.
Downloads
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 1989 Consejo Superior de Investigaciones Científicas (CSIC)

This work is licensed under a Creative Commons Attribution 4.0 International License.
© CSIC. Manuscripts published in both the print and online versions of this journal are the property of the Consejo Superior de Investigaciones Científicas, and quoting this source is a requirement for any partial or full reproduction.
All contents of this electronic edition, except where otherwise noted, are distributed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence. You may read the basic information and the legal text of the licence. The indication of the CC BY 4.0 licence must be expressly stated in this way when necessary.
Self-archiving in repositories, personal webpages or similar, of any version other than the final version of the work produced by the publisher, is not allowed.