Underground railway in Washington, U.S.A.
DOI:
https://doi.org/10.3989/ic.1979.v32.i313.2455Abstract
This article describes the works involved in the first stage of the Washington Underground (Subway) system which was begun in 1969 and scheduled for completion in 1983 and is the most modern metropolitan railway in North America. Lines have double track and will carry three million passengers daily. Different construction methods have been used throughout: tunnel formed try digging a trench then roofed and covered, excavated tunnel and elevated structures. Stations features answer to the strictest demands, provided with closed circuit television, air conditioning, noise dampening Systems, special access ways, fire protection Systems and automatic traffic control. Special attention is given to the two bridges over the Pentagon and over the Anacostia, pointing out their differences and the elevated structure at the National Airport.
Downloads
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 1979 Consejo Superior de Investigaciones Científicas (CSIC)

This work is licensed under a Creative Commons Attribution 4.0 International License.
© CSIC. Manuscripts published in both the print and online versions of this journal are the property of the Consejo Superior de Investigaciones Científicas, and quoting this source is a requirement for any partial or full reproduction.
All contents of this electronic edition, except where otherwise noted, are distributed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence. You may read the basic information and the legal text of the licence. The indication of the CC BY 4.0 licence must be expressly stated in this way when necessary.
Self-archiving in repositories, personal webpages or similar, of any version other than the final version of the work produced by the publisher, is not allowed.







