Intercity bridge over the Columbia river, U.S.A.
DOI:
https://doi.org/10.3989/ic.1979.v32.i313.2456Abstract
The Intercity Bridge over the Columbia River in the State of Washington, completed in 1978, was built in prestressed concrete using the traction method and introduces in the American bridge engineering an efficient, lasting and simple construction system. This article describes the job, the engineering studies carried out and the ways and means used to erect the structure. The 763 m Iong bridge was specially designed to achieve a high structural stability under any conceivable load, a Iong service life and low capital cost as well as a very low maintenance.
Downloads
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 1979 Consejo Superior de Investigaciones Científicas (CSIC)

This work is licensed under a Creative Commons Attribution 4.0 International License.
© CSIC. Manuscripts published in both the print and online versions of this journal are the property of the Consejo Superior de Investigaciones Científicas, and quoting this source is a requirement for any partial or full reproduction.
All contents of this electronic edition, except where otherwise noted, are distributed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence. You may read the basic information and the legal text of the licence. The indication of the CC BY 4.0 licence must be expressly stated in this way when necessary.
Self-archiving in repositories, personal webpages or similar, of any version other than the final version of the work produced by the publisher, is not allowed.







