«Straight-through» expressway through the Alps - Austria
DOI:
https://doi.org/10.3989/ic.1979.v32.i311.2472Abstract
This article deals with the construction procesa of the «straight» expressway through the Tauern AIps, where several engineering works deserve special mention: — The Tauern Tunnel, 6.4 km In length. — The Katschberg Tunnel, 5.4 km In length. — The Eben-Pongan cloverleaf. — The Liesertal stretch, 75 per 100 of its length being tunnels and viaducts. The most important of this Is the Tauern Tunnel where, owing to the serious problems encountered in the brittle character of the soil, the Austrian tunnel excavation process was used, this method consisting in tensing the mountain soil in order to be able to counteract the high pressures occurring. This tunnel has a 600 m long, 11 m diameter ventilation shaft, the largest of its kind in the World.
Downloads
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 1979 Consejo Superior de Investigaciones Científicas (CSIC)

This work is licensed under a Creative Commons Attribution 4.0 International License.
© CSIC. Manuscripts published in both the print and online versions of this journal are the property of the Consejo Superior de Investigaciones Científicas, and quoting this source is a requirement for any partial or full reproduction.
All contents of this electronic edition, except where otherwise noted, are distributed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence. You may read the basic information and the legal text of the licence. The indication of the CC BY 4.0 licence must be expressly stated in this way when necessary.
Self-archiving in repositories, personal webpages or similar, of any version other than the final version of the work produced by the publisher, is not allowed.







