Three large sea Platforms Sea North
DOI:
https://doi.org/10.3989/ic.1978.v30.i298.2597Abstract
This article analyzes the different building stages of three large sea platforms. After studying the structure's main characteristics, preparing scale models and calculating ail the elements, platform construction was carried out in three stages: — Dry-dock construction of the hull base. — Installation in the water and finishing the structure. — Immersion and bridge installation. Finally, the necessary operations to move the platform to its definite location were carried out. The structures are formed by a parallelepiped hull of reinforced concrete, divided into compartments by means of vertical orthogonals panels on top of which 2 or 4 piles are placed to support the bridge.
Downloads
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 1978 Consejo Superior de Investigaciones Científicas (CSIC)

This work is licensed under a Creative Commons Attribution 4.0 International License.
© CSIC. Manuscripts published in both the print and online versions of this journal are the property of the Consejo Superior de Investigaciones Científicas, and quoting this source is a requirement for any partial or full reproduction.
All contents of this electronic edition, except where otherwise noted, are distributed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence. You may read the basic information and the legal text of the licence. The indication of the CC BY 4.0 licence must be expressly stated in this way when necessary.
Self-archiving in repositories, personal webpages or similar, of any version other than the final version of the work produced by the publisher, is not allowed.