Chamartín Railway Station - Madrid - Spain

Authors

  • Roberto López Astorga EYSER

DOI:

https://doi.org/10.3989/ic.1976.v29.i285.2717

Abstract


This group of constructions which constitutes the final phase in the Chamartín railway station, situated in the northern part of Madrid, consist of: — A 18,250 m2 local train station which comprises halls, cafeterias, shops, luggage room, offices of Zone 1 of the Renfe and various other service installations. - A building for goods and sleeping carriages with storage department, customs, etc., and 7,025 m2 of usable area. — A 71,380 m2 long distance station with similar, although more ample services to those of the local train station; moreover, it is provided with a covered parking site and various complementary installation. — A 24,670 m2 hotel with a capacity of 210 rooms, distributed over five storeys, to which 4 more storeys can be added, whereby the capacity would be increased to 378 rooms. — A thermic central of 5,810 m2 contains all the installations required for this group of buildings. The complex is completed by service corridors for luggage and goods, parking places, connecting pedestrian crossing, and a complete road system with roads both at ground level as well as overhead and underground; a theatre and a big pedestrian square that forms the focus and connecting element between all the buildings. The design of the complex was determined according to the following factors: — Integration with the city: By means of the open arrangement of the various constructions towards the city and by the big pedestrian square that constitutes an efficient link with the adjoinining zones. — Connection with the city: Direct access to two main highways and several means of public transport, such as: underground station parallel to the platforms; bus lines with a stop at the entrance of the terminal; taxi station, etc. — Separation of the traffic within the complex from the city traffic: By means of traffic ways at different levels. — Maximum use of already constructed parts: By utilizing already finished works for the construction of the new ones, whereby considerable money and time were saved. — Adaptation to the topographical surrounding, taking advantage of the existing different ground levels, thus eliminating the risk of seismic movements. In general, a modulated reinforced concrete structure has been used, consisting of a series of longitudinal thick beams, reinforced concrete slab floorings and barrel vault ceilings with concrete arches. For the enclosure of the buildings continuous tile surfacing was used.

Downloads

Download data is not yet available.

Downloads

Published

1976-11-30

How to Cite

López Astorga, R. (1976). Chamartín Railway Station - Madrid - Spain. Informes De La Construcción, 29(285), 43–92. https://doi.org/10.3989/ic.1976.v29.i285.2717

Issue

Section

Research Articles