New Bridge at Saint-CIoud. Paris - France
DOI:
https://doi.org/10.3989/ic.1976.v29.i283.2736Abstract
This article describes the various problems that have been solved and the great amount of work that has been carried out to construct this bridge that connects the highway A-13 with the peripheral boulevard of the French capital making it possible to cross the Seine. The final solution has been that of a prestressed concrete bridge deck, supported by reinforced concrete piles on a foundation of plates or piles. The construction has a total length of 1,360 m out of which 1,103 are manufactured: a 574 m access viaduct and a 529 m bridge across the river. Altogether it comprises 14 sections, with spans of 46 m up to 101,75 m, one 42 m section on the left hand side and one 49 m section on the right hand side.
Downloads
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 1976 Consejo Superior de Investigaciones Científicas (CSIC)

This work is licensed under a Creative Commons Attribution 4.0 International License.
© CSIC. Manuscripts published in both the print and online versions of this journal are the property of the Consejo Superior de Investigaciones Científicas, and quoting this source is a requirement for any partial or full reproduction.
All contents of this electronic edition, except where otherwise noted, are distributed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence. You may read the basic information and the legal text of the licence. The indication of the CC BY 4.0 licence must be expressly stated in this way when necessary.
Self-archiving in repositories, personal webpages or similar, of any version other than the final version of the work produced by the publisher, is not allowed.







