Pool project in New York (USA)
DOI:
https://doi.org/10.3989/ic.1976.v28.i278.2779Abstract
These pool-recreational complexes have been constructed by means of 2.25 m2 prefabricated concrete modules, which could be connected and interchanged in different manners, according to the topographical characteristics of the sites. The method employed is the time-cost control method, which reduces the construction time as well as the final costs. Colourful graphic designs on the fair-faced surfaces provide the project with a pleasant atmosphere. Furthermore, the pools have the level-floors painted as basketball courts and can be drained to be used for that sport.
Downloads
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 1976 Consejo Superior de Investigaciones Científicas (CSIC)

This work is licensed under a Creative Commons Attribution 4.0 International License.
© CSIC. Manuscripts published in both the print and online versions of this journal are the property of the Consejo Superior de Investigaciones Científicas, and quoting this source is a requirement for any partial or full reproduction.
All contents of this electronic edition, except where otherwise noted, are distributed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence. You may read the basic information and the legal text of the licence. The indication of the CC BY 4.0 licence must be expressly stated in this way when necessary.
Self-archiving in repositories, personal webpages or similar, of any version other than the final version of the work produced by the publisher, is not allowed.







