The Ciba-Geigy Administration Building - Basel - Switzerland

Authors

  • Martin H. Burckhardt

DOI:

https://doi.org/10.3989/ic.1975.v28.i274.2830

Abstract


This building consists of two identical blocks —with four storeys above ground and a basement— connected by a third body in which the main entrance of the complex is located. The two first mentioned units have rectangular platform and contain: basement with technical installations; ground floor with a restaurant and a kitchen for the staff, service rooms and an air raid shelter; and on the three upper floors the offices are located which are reached by means of the connecting body. The offices are planned as office-landscapes thus forming a single space that occupies the entire floor. The working places have been placed in the periphery and in the centre the auxiliary rooms. The complex is completed by a three level parking place, situated on the other side of the approach road and joined directly to the building entrance by means of a subterranean passage.

Downloads

Download data is not yet available.

Downloads

Published

1975-10-30

How to Cite

Burckhardt, M. H. (1975). The Ciba-Geigy Administration Building - Basel - Switzerland. Informes De La Construcción, 28(274), 17–26. https://doi.org/10.3989/ic.1975.v28.i274.2830

Issue

Section

Research Articles