Hoechst Ltd. Administrative Building - Frankfurt/Main. German Federal Republic

Authors

  • Arquitectos Hentrich-Petschnigg & Partner

DOI:

https://doi.org/10.3989/ic.1975.v27.i268.2889

Abstract


The building forms part of the second phase of the construction programme of this important industrial firm and is designed as the administration and accountant centre. It consists of basement, ground floor and eight more floors, with three vertical communication nuclei: staircases, lifts and sanitary installations. The structure is of reinforced concrete; the enclosures of special pieces of hostalite and the windows are of thermopane glass.

Downloads

Download data is not yet available.

Downloads

Published

1975-03-30

How to Cite

Hentrich-Petschnigg & Partner, A. (1975). Hoechst Ltd. Administrative Building - Frankfurt/Main. German Federal Republic. Informes De La Construcción, 27(268), 15–22. https://doi.org/10.3989/ic.1975.v27.i268.2889

Issue

Section

Research Articles