The Öland bridge spans across the Kalmar strait, reaching from Möllstorpslage, on the island of Öland, to the island of N. Skallö; from here to the island of Svinö and then to Jutnabben, on the Swedish peninsula. It has 155 spans out of which 147 are small spans, two medium and six central, each one of them 130 m, with a total length of 6.070 m. The high arches have been constructed by the system of successive corbels and the low ones with a launching of big beams of reinforced concrete. Foundations on columns or poured on site in pneumatic emptied boxes, depending on the cases and piers of reinforced concrete, constructed by means of sliding formwork. The Construction Firm has been Skanska Cementgjuteriet, on account of the Government Administration.

Downloads

Download data is not yet available.

Downloads

Published

1974-06-30

How to Cite

Skanska Cementgjüteriet, E. (1974). The Öland bridge - Sweden. Informes De La Construcción, 27(261), 83–95. https://doi.org/10.3989/ic.1974.v27.i261.3021

Issue

Section

Research Articles