General plan for sewerage Stockholm - Sweden
DOI:
https://doi.org/10.3989/ic.1974.v27.i260.3055Abstract
In the article an ambitious plan is described for solving the problem of how to deal with the sewage water that originates from the flats in the south-east area of the capital and its outlet into the sea. The Himmerfjärden unit consists of a system of tunnels with a total length of 40 km and a depth capacity of 50 m and 100 m. The slope of these sewage tunnels is 1‰, with floor slabs of concrete. An efficient service for 250,000 people is foreseen with a possibility of an increase to 500,000 without the necessity of adding really important works. The construction works, the above mentioned tunels, as well as the pumping station and the mechanical cleaning grids have been carried out by the firm Skanska Cementgjuteriet.
Downloads
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 1974 Consejo Superior de Investigaciones Científicas (CSIC)

This work is licensed under a Creative Commons Attribution 4.0 International License.
© CSIC. Manuscripts published in both the print and online versions of this journal are the property of the Consejo Superior de Investigaciones Científicas, and quoting this source is a requirement for any partial or full reproduction.
All contents of this electronic edition, except where otherwise noted, are distributed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence. You may read the basic information and the legal text of the licence. The indication of the CC BY 4.0 licence must be expressly stated in this way when necessary.
Self-archiving in repositories, personal webpages or similar, of any version other than the final version of the work produced by the publisher, is not allowed.