Hydroelectric power station, Zemm – Austria
DOI:
https://doi.org/10.3989/ic.1972.v25.i245.3190Abstract
In order to accommodate an increasing rate, doubled every ten years, of current consumption in this country, two hydroelectric power plants were constructed in the Zemm River. This type of power plant has the advantage of being able to produce energy at the time of consumption so as to be to handle peak energy production; while the normal power load requirement is covered by nuclear, petroleum and gas, and river power plants. These two plants have 517.500 kW, with a total annual yield of 648 GWh, or 778 GWh with pumping equipment. The gravity dam of the upper reservoir is 131 m high and 725 m long at the top. 960,000 m3 of concrete were used in its construction and it has an annual storage capacity of 127.4 millions m3. The earthen dam of the lower reservoir, which required 820,000 m3 to build, is about 28 m high and 480 m wide at the crown, with a capacity of 6,4 millions m3.
Downloads
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 1972 Consejo Superior de Investigaciones Científicas (CSIC)

This work is licensed under a Creative Commons Attribution 4.0 International License.
© CSIC. Manuscripts published in both the print and online versions of this journal are the property of the Consejo Superior de Investigaciones Científicas, and quoting this source is a requirement for any partial or full reproduction.
All contents of this electronic edition, except where otherwise noted, are distributed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence. You may read the basic information and the legal text of the licence. The indication of the CC BY 4.0 licence must be expressly stated in this way when necessary.
Self-archiving in repositories, personal webpages or similar, of any version other than the final version of the work produced by the publisher, is not allowed.







