New pipeline bridge for Central Europe
DOI:
https://doi.org/10.3989/ic.1971.v23.i229.3391Abstract
This bridge runs over the Po river, near Pavia, and is 1,370 m long. It is divided into spans of 36 m length each. The horizontal structure of the bridge consists of sets of four continuous girders, running over six spans, and two continuous girders, extending over seven spans. The piles are 14 m high and 1.50 m in diameter, and rest on the extension of the foundation piles. This article describes details of the project and the system of placing the continuous girders.
Downloads
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 1971 Consejo Superior de Investigaciones Científicas (CSIC)

This work is licensed under a Creative Commons Attribution 4.0 International License.
© CSIC. Manuscripts published in both the print and online versions of this journal are the property of the Consejo Superior de Investigaciones Científicas, and quoting this source is a requirement for any partial or full reproduction.
All contents of this electronic edition, except where otherwise noted, are distributed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence. You may read the basic information and the legal text of the licence. The indication of the CC BY 4.0 licence must be expressly stated in this way when necessary.
Self-archiving in repositories, personal webpages or similar, of any version other than the final version of the work produced by the publisher, is not allowed.







