Footbridge at the Wiesbaden- Schierstein, Genmnny
DOI:
https://doi.org/10.3989/ic.1970.v23.i225.3514Abstract
This distinguished engineering design was constructed to commemorate the centenary of the Dyckerhoff cement plant. It was built by successive overhangs, using prestressed light weight concrete, mostly of white colour. The use of counterweight approach ramps is an interesting feature, providing an original static arrangement and reducing the weight of the foundation, which in this case, because of the nature of the soil, was an expensive item.
Downloads
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 1970 Consejo Superior de Investigaciones Científicas (CSIC)

This work is licensed under a Creative Commons Attribution 4.0 International License.
© CSIC. Manuscripts published in both the print and online versions of this journal are the property of the Consejo Superior de Investigaciones Científicas, and quoting this source is a requirement for any partial or full reproduction.
All contents of this electronic edition, except where otherwise noted, are distributed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence. You may read the basic information and the legal text of the licence. The indication of the CC BY 4.0 licence must be expressly stated in this way when necessary.
Self-archiving in repositories, personal webpages or similar, of any version other than the final version of the work produced by the publisher, is not allowed.







