The civil engineering work connected with the Mont-Cenis hydroelectric project

Authors

  • Georges Vié

DOI:

https://doi.org/10.3989/ic.1969.v22.i211.3710

Abstract


The new dam at Mont Cenis has increased to water volume in the reservoir from 32 to 320 million m3 and provides a potential energy of 650.000 million Mp x m. This article describes the work involved in the construction of this project. Among other features, the water has been led to the reservoir along a network of varying cross-section, and of 28 km total length. The pressure conduit has been designed for a flow rate of 51 m3/s, its diameter varying between 4 and 5 m. The new power stations at Villarodin are fed by a pipe 3.6 km in length and 3 m in diameter. This conduit runs along a trench and is isolated from the ground, because of the gypsum and anhydrites contained in the soil. Its weight is 10.000 Mp, which is a European record. The power station comprises to vertical Pelton turbines of 195 MVA each, and a yearly output of 485 kWh.

Downloads

Download data is not yet available.

Downloads

Published

1969-06-30

How to Cite

Vié, G. (1969). The civil engineering work connected with the Mont-Cenis hydroelectric project. Informes De La Construcción, 22(211), 71–98. https://doi.org/10.3989/ic.1969.v22.i211.3710

Issue

Section

Research Articles