The civil engineering work connected with the Mont-Cenis hydroelectric project
DOI:
https://doi.org/10.3989/ic.1969.v22.i211.3710Abstract
The new dam at Mont Cenis has increased to water volume in the reservoir from 32 to 320 million m3 and provides a potential energy of 650.000 million Mp x m. This article describes the work involved in the construction of this project. Among other features, the water has been led to the reservoir along a network of varying cross-section, and of 28 km total length. The pressure conduit has been designed for a flow rate of 51 m3/s, its diameter varying between 4 and 5 m. The new power stations at Villarodin are fed by a pipe 3.6 km in length and 3 m in diameter. This conduit runs along a trench and is isolated from the ground, because of the gypsum and anhydrites contained in the soil. Its weight is 10.000 Mp, which is a European record. The power station comprises to vertical Pelton turbines of 195 MVA each, and a yearly output of 485 kWh.
Downloads
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 1969 Consejo Superior de Investigaciones Científicas (CSIC)

This work is licensed under a Creative Commons Attribution 4.0 International License.
© CSIC. Manuscripts published in both the print and online versions of this journal are the property of the Consejo Superior de Investigaciones Científicas, and quoting this source is a requirement for any partial or full reproduction.
All contents of this electronic edition, except where otherwise noted, are distributed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence. You may read the basic information and the legal text of the licence. The indication of the CC BY 4.0 licence must be expressly stated in this way when necessary.
Self-archiving in repositories, personal webpages or similar, of any version other than the final version of the work produced by the publisher, is not allowed.







