Trieste terminal of the transalpine oleoduc

Authors

  • G. Mannucci

DOI:

https://doi.org/10.3989/ic.1969.v21.i209.3738

Abstract


In this article emphasis is placed on the successful use of steel and of prefabricated structural parts, although the project is situated within a hostile environment for such materials, namely, the sea. The article also indicates the interesting varieties of welding that have been utilised in the fabrication of the tubular parts, and also the types of protection adopted for the structure, to defend it from the highly aggressive medium.

Downloads

Download data is not yet available.

Downloads

Published

1969-04-30

How to Cite

Mannucci, G. (1969). Trieste terminal of the transalpine oleoduc. Informes De La Construcción, 21(209), 83–91. https://doi.org/10.3989/ic.1969.v21.i209.3738

Issue

Section

Research Articles