Olympic course for rowing and canoeing
DOI:
https://doi.org/10.3989/ic.1968.v21.i205.3800Abstract
The whole project consists of the following facilities: — the course itself, which is a 2.200 m long canal, and communicates with another secondary one, of 1.000 m length, which is used for training, and as return canal. — an office building and fixed stands, at the finishing line. At this point there are also press services, radio and T.V. facilities, a finishing observation tower, boat house, dressing and baths pavillion, control building, starting tower, aligning pavillions, observation posts, prize giving stand, jetty for steam boats, starting and finishing pontoons, longitudinal roads, parallel to the trainers track, and moveable T.V. units. All these installations were specially built for the Olympic Games in seven months, and the site is 10 km from the Olympic Village and 22 km from the Main Square of Mexico City.
Downloads
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 1968 Consejo Superior de Investigaciones Científicas (CSIC)

This work is licensed under a Creative Commons Attribution 4.0 International License.
© CSIC. Manuscripts published in both the print and online versions of this journal are the property of the Consejo Superior de Investigaciones Científicas, and quoting this source is a requirement for any partial or full reproduction.
All contents of this electronic edition, except where otherwise noted, are distributed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence. You may read the basic information and the legal text of the licence. The indication of the CC BY 4.0 licence must be expressly stated in this way when necessary.
Self-archiving in repositories, personal webpages or similar, of any version other than the final version of the work produced by the publisher, is not allowed.







