Bernabé Carazo Carazo
DOI:
https://doi.org/10.3989/ic.1968.v21.i201.3879Abstract
This industrial installation includes a parking site for the buthane gas trucks, filling hall, storage for containers, pumping house, discharging enclosure for tanking trucks, water pump and air compressor house, fire fighting unit, repairs and maintenance workshop, offices and general services and electricity installations. Constructively, the hall for the filling, emptying and storage of containers is of particular interest; it consists of ten hyperbolic paraboloid umbrellas of reinforced concrete.
Downloads
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 1968 Consejo Superior de Investigaciones Científicas (CSIC)

This work is licensed under a Creative Commons Attribution 4.0 International License.
© CSIC. Manuscripts published in both the print and online versions of this journal are the property of the Consejo Superior de Investigaciones Científicas, and quoting this source is a requirement for any partial or full reproduction.
All contents of this electronic edition, except where otherwise noted, are distributed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence. You may read the basic information and the legal text of the licence. The indication of the CC BY 4.0 licence must be expressly stated in this way when necessary.
Self-archiving in repositories, personal webpages or similar, of any version other than the final version of the work produced by the publisher, is not allowed.







