New suspension bridge over the Tigris in Bagdad
DOI:
https://doi.org/10.3989/ic.1968.v20.i198.3926Abstract
This suspension bridge is the first of its type built in Irak. Its structure is mainly of steel, though the deck is a compound construction of steel and concrete. It has three spans: a central one of 168 m length, and two lateral ones, each 84 m long. There are also two approach spans, each of 23 m, which have been made necessary due to the weakness of the soil. This is also the reason why the abutments do not support the load on the cables, so that the structure is anchored to itself: to achieve this the foundations have been reinforced with steel. The cables consist of 37 chords, each having 91 cables, of 4.5 mm diameter each, and a permissible stress of 158 kg/mm2. The piles are protected with screens of metal sheetpiling.
Downloads
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 1968 Consejo Superior de Investigaciones Científicas (CSIC)

This work is licensed under a Creative Commons Attribution 4.0 International License.
© CSIC. Manuscripts published in both the print and online versions of this journal are the property of the Consejo Superior de Investigaciones Científicas, and quoting this source is a requirement for any partial or full reproduction.
All contents of this electronic edition, except where otherwise noted, are distributed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence. You may read the basic information and the legal text of the licence. The indication of the CC BY 4.0 licence must be expressly stated in this way when necessary.
Self-archiving in repositories, personal webpages or similar, of any version other than the final version of the work produced by the publisher, is not allowed.







