Statistical estimation of the duration of activities in a pert program

Authors

  • Guillertmo Carrillo Vargas
  • Pedro González-Haba González

DOI:

https://doi.org/10.3989/ic.1967.v20.i191.4036

Abstract


This is a statistical study of the various procedures which are adopted to calculate the duration of activities in a Pert program. As this duration is an initial premiss in any programming project, its conclusions have general applicability.