I Part. Project for the Atazar Canal
DOI:
https://doi.org/10.3989/ic.1967.v19.i188.4097Abstract
The Atazar Canal helps to supply Madrid with water, from the rivers Lozoya, Jarama and Sorbe. The section which operates at present starts at the Torrelaguna dam and finishes at the El Goloso reservoir. Later a further section will be added, from the Atazar dam, on the Lozoya river, to link up with the control dam at Torrelaguna. The canal capacity is 16 m3/sec, and it is 43.47 km long. It has a slope of 4/10.000. The cross section is similar to that of the Jarama canal, already built. There are interconnections between this canal and the Canal Alto, which previously supplied the high and medium part of Madrid. To overcome the ground unevenness 5 syphons have been built, the most important of which is the Colmenar Goloso syphon, which is 10.88 km in length. Construction commenced on December 10, 1962, and water reached Madrid on June 15th, 1966. The initial budget for this project was 1,500 million pesetas.
Downloads
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 1967 Consejo Superior de Investigaciones Científicas (CSIC)

This work is licensed under a Creative Commons Attribution 4.0 International License.
© CSIC. Manuscripts published in both the print and online versions of this journal are the property of the Consejo Superior de Investigaciones Científicas, and quoting this source is a requirement for any partial or full reproduction.
All contents of this electronic edition, except where otherwise noted, are distributed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence. You may read the basic information and the legal text of the licence. The indication of the CC BY 4.0 licence must be expressly stated in this way when necessary.
Self-archiving in repositories, personal webpages or similar, of any version other than the final version of the work produced by the publisher, is not allowed.







