"Märker" cement facory, Germany

Authors

  • Kurt Ackermann

DOI:

https://doi.org/10.3989/ic.1967.v19.i187.4113

Abstract


The first stage of this project has been completed. It includes installations for the manufacture, grinding and storage of cement, and also workshops. It is an outstanding design because of its high efficiency, and the dry process of clinker production has been adopted in preference to the more traditional wet process, since it is considered to be more advantageous.