Bridge over the river Trisanna, Austria
DOI:
https://doi.org/10.3989/ic.1966.v19.i184.4162Abstract
This bridge, already the subject of a previous reform, has been recently readapted to the requirements of modem traffic. The reform was done without interrupting its use. The central metallic span, of 120 m length, was erected above the old one, with the aid of auxiliary structures on each side of the bridge. When completed, it was moved to its permanent position. The structure of this span is an arch with a tie member and a suspended deck, which rests on two main full web girders of 3.60 m depth, which are suitably stabilised laterally.
Downloads
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 1966 Consejo Superior de Investigaciones Científicas (CSIC)

This work is licensed under a Creative Commons Attribution 4.0 International License.
© CSIC. Manuscripts published in both the print and online versions of this journal are the property of the Consejo Superior de Investigaciones Científicas, and quoting this source is a requirement for any partial or full reproduction.
All contents of this electronic edition, except where otherwise noted, are distributed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence. You may read the basic information and the legal text of the licence. The indication of the CC BY 4.0 licence must be expressly stated in this way when necessary.
Self-archiving in repositories, personal webpages or similar, of any version other than the final version of the work produced by the publisher, is not allowed.