Bridge over the river Trisanna, Austria

Authors

  • W. Schmidt

DOI:

https://doi.org/10.3989/ic.1966.v19.i184.4162

Abstract


This bridge, already the subject of a previous reform, has been recently readapted to the requirements of modem traffic. The reform was done without interrupting its use. The central metallic span, of 120 m length, was erected above the old one, with the aid of auxiliary structures on each side of the bridge. When completed, it was moved to its permanent position. The structure of this span is an arch with a tie member and a suspended deck, which rests on two main full web girders of 3.60 m depth, which are suitably stabilised laterally.