Vinon dam (France)
DOI:
https://doi.org/10.3989/ic.1966.v19.i180.4236Abstract
The hydroelectric exploitation of the Verdon stream, which is the most important of those flowing into the Durance river, is achieved by means of the Vinon Dam, and other dams. The combined water supply from the Greoux dam and the Vinon dam provide a controlled flow for the Provence canal, which is fed through the Maurras gallery. In this Alpine zone a general study is being conducted at present to coordinate in the best possible manner the use of the torrential water, available in the various valleys, both for irrigation and power producing purposes. The most important aspects of the Vinon project are the drilling of the very long galleries. This work has been done with very modem equipment of high efficiency. The author describes this in detail. The Vinon power plant is partly underground, and has a central cylindrical section, of 19 m diameter. This power station has a Francis unit, of 27.800 kw, operated by a water supply of 40 m3/sec under a hydrostatic head of 78 m.
Downloads
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 1966 Consejo Superior de Investigaciones Científicas (CSIC)

This work is licensed under a Creative Commons Attribution 4.0 International License.
© CSIC. Manuscripts published in both the print and online versions of this journal are the property of the Consejo Superior de Investigaciones Científicas, and quoting this source is a requirement for any partial or full reproduction.
All contents of this electronic edition, except where otherwise noted, are distributed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence. You may read the basic information and the legal text of the licence. The indication of the CC BY 4.0 licence must be expressly stated in this way when necessary.
Self-archiving in repositories, personal webpages or similar, of any version other than the final version of the work produced by the publisher, is not allowed.







