Miranda hydroelectric power station

Authors

  • José Luis Vilanova Bosch

DOI:

https://doi.org/10.3989/ic.1964.v17.i162.4526

Abstract


The water from the rivers Pigüeña and Somiedo is collected and conducted to the Salto de Miranda hydroelectric power station. The civil engineers Constructora Hidrocivil, S. A., carried out the project for the owners of this power station. Hidroeléctrica Cantábrica, S. A. The project is situated in the mountains, where a small dam collects the water. This is then led through a long conduit to the entry of the pressure pipes leading to the turbines. The water later flows back to the original river course. The total pressure head is 410 ms, and the mean volume of water which is exploited is 15 m3/sec. As the author is planning to publish additional articles describing specific aspects of the problem, no attempt is made here to emphasize the importance of many significant features of this project. In carrying out this project, the contractors devoted great care to the planning of the various constructional steps, in order that no delay in one particular operation should hold up the progress in the rest of the work.

Downloads

Download data is not yet available.

Downloads

Published

1964-07-30

How to Cite

Vilanova Bosch, J. L. (1964). Miranda hydroelectric power station. Informes De La Construcción, 17(162), 111–123. https://doi.org/10.3989/ic.1964.v17.i162.4526

Issue

Section

Research Articles