Berlin Bridges
DOI:
https://doi.org/10.3989/ic.1963.v15.i148.4750Abstract
The last war destroyed a large number of civil works, among which were the Berlin bridges. As the number of these was considerable, it was decided to improve on the original designs and methods of construction, taking advantage of new materials and prestressing techniques. Of the 84 reconstructed bridges, 24 of them have been made in prestressed concrete. This emphasizes what considerable importance was attached to this constructional method at a time when this technology had not yet reached its present day mature development. The rebuilt bridges have spans varying between 25 and 100 ms. Their foundations differ considerably in each particular case. Some consist of pile structures, others are of sheet piling, and others again are caissons. At present the most important prestressed bridge in Berlin is the Disching bridge, which runs over the Havel, and carries the road to Spandau. Its single span is 94 ms long, and the ratio of rise to span is 1/63.1.
Downloads
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 1963 Consejo Superior de Investigaciones Científicas (CSIC)

This work is licensed under a Creative Commons Attribution 4.0 International License.
© CSIC. Manuscripts published in both the print and online versions of this journal are the property of the Consejo Superior de Investigaciones Científicas, and quoting this source is a requirement for any partial or full reproduction.
All contents of this electronic edition, except where otherwise noted, are distributed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence. You may read the basic information and the legal text of the licence. The indication of the CC BY 4.0 licence must be expressly stated in this way when necessary.
Self-archiving in repositories, personal webpages or similar, of any version other than the final version of the work produced by the publisher, is not allowed.







