Approach to the comprehensive economic management of building works by production processes: Elaboration of the COP model for building cost control
DOI:
https://doi.org/10.3989/ic.16.121Keywords:
Cost control, comprehensive economic management, processes, planning, building works, construction economicsAbstract
The deep economic crisis recently undergone in Spain has highlighted the vulnerability of the Construction Industry and the necessity of the development of new tools to increase its efficiency. Focusing on the economic dimension of building works, a pressing and growing problem is the significant deviation identified among estimates and real building costs. In order to solve this failure, a model for building cost control based on production processes is proposed, the COP model. This model extrapolates the approach of the model for estimating building construction costs by processes, the POP model, to the phase of monitoring and economic control of building construction works. Therefore, the combined implementation of both models, POP and COP, provides an efficient and comprehensive economic management of building works by accurately adjusting to their planning and development and facilitating the effective identification of deviations and adoption of corrective measures to settle the mistakes detected.
Downloads
References
(1) Farrell M. J. (1957). The Measurement of Productive Efficiency. Journal of the Royal Statistical Society, Series A, 120: 253-281. https://doi.org/10.2307/2343100
(2) Bustos, O. (2014). Factores latentes de desviación de presupuestos en proyectos de Arquitectura. Tesis Doctoral. Valencia: Universitat Politècnica de València.
(3) García-Erviti F., Armengot-Paradinas J., Ramírez-Pacheco, G. (2015). El análisis del coste del ciclo de vida como herramienta para la evaluación económica de la edificación sostenible. Estado de la cuestión. Informes de la Construcción, 67(537): e056. https://doi.org/10.3989/ic.12.119
(4) Montes M. V., Monterde D., Villoria P. (2011). Approach to the Use of Global Indicators for the Assessment of the Environmental Level of Construction Products. The Open Construction and Building Technology Journal, 5(2): 141-148.
(5) Ramírez-de-Arellano, A. (1998). Presupuestación de obras. Sevilla: Secretariado de Publicaciones de la Universidad de Sevilla.
(6) Woo K. (2001). Activity-based costing and its application to lean construction. En: 9th Annual Conference of the International Group for Lean Construction. Singapur: National University of Singapore.
(7) Yuan, F. (2011). Applying activity-based costing approach for construction logistics cost analysis. Construction Innovation, 11(3): 259-281. https://doi.org/10.1108/14714171111149007
(8) Gyoh, L. E. (1999). Design-Management and Planning for Photovoltaic Cladding Systems within the UK Construction Industry. Tesis Doctoral. Sheffield: The University of Sheffield.
(9) Pulaski, M. H. (2005). The alignment of sustainability and constructability: A continuous value enhancement process. Tesis Doctoral. State College: The Pennsylvania State University.
(10) Nguyen, H. V. (2010). Process-Based Cost Modeling to Support Target Value Design. Tesis Doctoral. Berkeley: University of California.
(11) Montes, M. V., Falcón, R. M., Ramírez-de-Arellano, A. (2014). Estimating Building Construction Costs by Production Processes. The Open Construction and Building Technology Journal, 8: 171-181. https://doi.org/10.2174/1874836801408010171
(12) Montes, M. V., Falcón, R. M., Ramírez-de-Arellano, A. (2016). Estimating Building Construction Costs: Analysis of the Process-based Estimate Model (POP Model). Revista Ingeniería de la Construcción, 31(1): 17-25, https://doi.org/10.4067/S0718-50732016000100002
(13) Basabe del Castillo, J. B. (2012). Costes e Ingresos Globales en Edificación. Trabajo Final del Máster Universitario en Gestión Integral en Edificación. Sevilla: Universidad de Sevilla.
(14) Cortes Generales (2011). Real Decreto Legislativo 3/2011, de 14 de noviembre, por el que se aprueba el texto refundido de la Ley de Contratos del Sector Público. Boletín Oficial del Estado, nº 276. Espa-a.
(15) Montes, M. V. (2016). Sistema de Clasificación de Procesos Básicos y Sistema de Clasificación de Procesos de Ejecución. ResearchGate.
Published
How to Cite
Issue
Section
License
Copyright (c) 2018 Consejo Superior de Investigaciones Científicas (CSIC)

This work is licensed under a Creative Commons Attribution 4.0 International License.
© CSIC. Manuscripts published in both the print and online versions of this journal are the property of the Consejo Superior de Investigaciones Científicas, and quoting this source is a requirement for any partial or full reproduction.
All contents of this electronic edition, except where otherwise noted, are distributed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence. You may read the basic information and the legal text of the licence. The indication of the CC BY 4.0 licence must be expressly stated in this way when necessary.
Self-archiving in repositories, personal webpages or similar, of any version other than the final version of the work produced by the publisher, is not allowed.







