María de Molina tunnel, Madrid. Optimization in the design and description of the structural solutions adopted
DOI:
https://doi.org/10.3989/ic.2002.v54.i480.608Abstract
Maria de Molina tunnel which will join paseo de la Castellana and Velázquez street with the N-II highway (Madrid - Barcelona) will be the largest municipal underground work in Spain. The tunnel is 1171 meters long and it will absorbe a traffic of 30000 vehicles going out every day. The initial part of the tunnel has been designed as false tunnels made with foundation walls and slabs. The concrete has been cast over the ground and the tunnel has been excavated afterwards in order to minimize the effect of the work on Madrid traffic. Once a sufficient depth has been reached, two different construction systems have been proposed, depending on the conditions the tunnel finds in each case. The project presents some singular points in which the solutions adopted are structurally extraordinary.
Downloads
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2002 Consejo Superior de Investigaciones Científicas (CSIC)

This work is licensed under a Creative Commons Attribution 4.0 International License.
© CSIC. Manuscripts published in both the print and online versions of this journal are the property of the Consejo Superior de Investigaciones Científicas, and quoting this source is a requirement for any partial or full reproduction.
All contents of this electronic edition, except where otherwise noted, are distributed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence. You may read the basic information and the legal text of the licence. The indication of the CC BY 4.0 licence must be expressly stated in this way when necessary.
Self-archiving in repositories, personal webpages or similar, of any version other than the final version of the work produced by the publisher, is not allowed.







