María de Molina tunnel, Madrid. Optimization in the design and description of the structural solutions adopted

Authors

  • Fernando Catalá Moreno Dirección de obra Ayuntamiento de Madrid
  • Jorge Presa Matilla Dirección de obra Ayuntamiento de Madrid
  • Hugo Corres Peiretti FHECOR Ingenieros Consultores
  • Julio Sánchez Delgado FHECOR Ingenieros Consultores
  • Laura Granda San Segundo FHECOR Ingenieros Consultores

DOI:

https://doi.org/10.3989/ic.2002.v54.i480.608

Abstract


Maria de Molina tunnel which will join paseo de la Castellana and Velázquez street with the N-II highway (Madrid - Barcelona) will be the largest municipal underground work in Spain. The tunnel is 1171 meters long and it will absorbe a traffic of 30000 vehicles going out every day. The initial part of the tunnel has been designed as false tunnels made with foundation walls and slabs. The concrete has been cast over the ground and the tunnel has been excavated afterwards in order to minimize the effect of the work on Madrid traffic. Once a sufficient depth has been reached, two different construction systems have been proposed, depending on the conditions the tunnel finds in each case. The project presents some singular points in which the solutions adopted are structurally extraordinary.

Downloads

Download data is not yet available.

Downloads

Published

2002-08-30

How to Cite

Catalá Moreno, F., Presa Matilla, J., Corres Peiretti, H., Sánchez Delgado, J., & Granda San Segundo, L. (2002). María de Molina tunnel, Madrid. Optimization in the design and description of the structural solutions adopted. Informes De La Construcción, 54(480), 5–27. https://doi.org/10.3989/ic.2002.v54.i480.608

Issue

Section

Research Articles