Present context of quality costs system developed and applied to construction projects: the necessity of measurement of quality in design
DOI:
https://doi.org/10.3989/ic.07.004Keywords:
quality, quality costs, construction projects, designAbstract
This paper presents an analysis of the approaches developed for measuring and tracking the quality costs in construction projects, providing a current context of this quality management tool. A literature review of currents publications on generic models of quality costs applied on construction projects (QPMS, QPTS, QCM, CQCQS, PCM y PROMQACS) was performed. These approaches have been developed since the eighties. It was observed that these approaches share a common aspect regarding the timing of their application during the project; which begins at the start of construction on site, without taking into account the failures and quality management costs within the design process. In order to enhance this context, a literature review was made to evaluate actual practices during the design process. This work demonstrates the need to measure quality costs during project design as well as the limitations of the proposed quality costs systems currently applied in the construction industry. Emphasis is made about the importance of implementing a quality management tool in line with continual improvement approaches, in a context where the number of publications on quality costs is limited, given the number and complexity of the typical processes of a construction project.
Downloads
References
(1) Ahmed, S. M., Aoieong, R. T., Tang, S. L. y Zheng, D. X.M.: “A comparison of quality management systems in the construction industries of Hong Kong and the USA”. International Journal of Quality and Reliability Management, Vol. 22, nº 2 (2005), pp. 149-161. doi:10.1108/02656710510577215
(2) Low, S. P. y Yeo, H. K. C.: “A construction quality costs quantifying system for the building industry”. International Journal of Quality and Reliability Management, Vol. 15, nº 3 (1998), pp. 329-349. doi:10.1108/02656719810198926
(3) Gracia V., S. y Dzul L., L.: “Modelo PEF de costes de la calidad como herramienta de gestión en empresas constructoras: una visión actual”. Revista Ingeniería de Construcción, Vol. 22, nº 1 (2007), pp. 43-56.
(4) Hwang, G. H. y Aspinwall, E. M.: “Quality cost models and their application: a review”. Total Quality Management, Vol. 7, nº 3 (1996), pp. 267-281.
(5) Schiffauerova, A. y Thomson, V.: “A review of research on cost of quality models and best practices”. International Journal of Quality & Reliability Management, Vol. 23, nº 6 (2006) pp. 647-669. doi:10.1108/02656710610672470
(6) Weheba, G. S. y Elshennawy, A. K.: “A revised model for the cost of quality”. Journal of Quality and Reliability Management, Vol. 21, nº 3 (2004), pp. 291-308. doi:10.1108/02656710410522739
(7) Climent Serrano, Salvador.: “Los Costes De Calidad Como Estrategia Empresarial: Evidencia Empírica en la Comunidad Valenciana”. Tesis Doctoral. España. UV, Facultad de Economía (2003), 523 pp.
(8) Instituto Tecnológico de Galicia.: Proyecto Costes de Calidad en la Construcción (CCCON). (en línea). España, en: http://www.itg.es/proyectos/detalle.php?IdProyecto=28” (Accesado el día 2 de mayo de 2007).
(9) Love, P. E. D. e Irani, Z.: “A project management quality cost information system for the construction industry”. Information and Management, Vol. 40 (2003), pp. 649–661. doi:10.1016/S0378-7206(02)00094-0
(10) Aoieong, R. T., Tang, S. L. y Syed, M. A.: “A process approach in measuring quality costs of construction projects: model development”. Construction Management and Economics, Vol. 20, nº 2 (2002), pp. 179-192. doi:10.1080/01446190110109157
(11) Abdul-Rahman, H.: “The cost of non-conformance during a highway project: a case study”. Construction Management and Economics, Vol. 13 (1995), pp. 23-32. doi:10.1080/01446199500000004
(12) CII: “Costs of Quality Deviations in Design and Construction”. Quality Management Task Force, Construction Industry Institute, publicación 10 (1) (1989).
(13) Patterson, L., Ledbetter, W.B.: “The Cost of Quality: A Management Tool.” Excellence in the Construction Project, American Society of Civil Engineers (1989) pp. 100–105.
(14) Willis, T. H. y Willis, W. D. A quality performance management system for industrial construction engineering projects. International Journal of Quality and Reliability Management, Vol. 13, nº 9 (1996), pp. 38-48. doi:10.1108/02656719610150605
(15) Davis, K.: “Measuring Design and Construction Quality Costs”. Source Document 30, Construction Industry Institute (1987).
(16) Davis,K., Ledbetter, W.B., Burati, J.L.: “Measuring design and construction quality costs”. ASCE Journal of Construction Engineering and Management, Vol. 115 (1989), pp. 389-400.
(17) Abdul-Rahman, H.: “Capturing the cost of quality failures in civil engineering”. International Journal of Quality & Reliability Management, Vol. 10, nº 3 (1993), pp. 20-32.
(18) Abdul-Rahman, H.: “Capturing the costs of non-conformance on constructions sities (an application of the quality costs matrix)”. International Journal of Quality & Reliability Management, Vol. 13, nº 1 (1996), pp. 48-60. doi:10.1108/02656719610108314
(19) Hall, M. y Tomkins, C.: “A cost of quality analysis of a building project: towards a complete methodology for design and build”. Construction Management and Economics, Vol. 19 (2001) pp. 727-740. doi:10.1080/01446190110066146
(20) Tang, S. L., Aoieong, R. T.y Ahmed, S. M.: “The use of Process Cost Model (PCM) for measuring quality costs of construction projects: model testing”. Construction Management and Economics, Vol. 22, nº 3 (2004) pp. 263–275. doi:10.1080/0144619032000064091
(21) Love, P.E.D., y Li, H.: “Quantifying the causes and costs of rework in construction”. Construction Management and Economics, Vol. 18 (2000), pp. 479-490 doi:10.1080/01446190050024897
(22) Love, P. E. D. y Sohal, A. S.: “Capturing rework costs in projects”. Managerial Auditing Journal, Vol. 8, n° 4 (2003), pp. 329-339. doi:10.1108/02686900310474343
(23) Barber, P., Graves, A., Hall, M., Sheath, D. y Tomkins, C.: “Quality failure costs in civil engineering projects”. International Journal of Quality & Reliability Management, Vol.17 (2000), pp. 479-492. doi:10.1108/02656710010298544
(24) Chuang, C.-C. y Tsai, C.-C.: “A fuzzy neural approach for diagnosing PCM executing problem”. Proceedings of the 2005 Systems and Information Engineering Design Symposium (2005), pp.171-176.
(25) Wang, Ching-Hwang; Tsai, Chia-Chang y Cheng, Yi-Yen.: “Knowledge-based diagnosis model for PCM executing problems in public construction”. Construction Management and Economics, Vol. 25, nº 2 (2007), pp. 129-142. doi:10.1080/01446190600799091
(26) Ezeldin, A. S. y Abu-Ghazala, H.: “Quality Management System for Design Consultants: Development and Application on Projects in the Middle East”. Journal of management in engineering, Vol. 23, nº (2) (2007), pp. 75-87.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2009 Consejo Superior de Investigaciones Científicas (CSIC)

This work is licensed under a Creative Commons Attribution 4.0 International License.
© CSIC. Manuscripts published in both the print and online versions of this journal are the property of the Consejo Superior de Investigaciones Científicas, and quoting this source is a requirement for any partial or full reproduction.
All contents of this electronic edition, except where otherwise noted, are distributed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence. You may read the basic information and the legal text of the licence. The indication of the CC BY 4.0 licence must be expressly stated in this way when necessary.
Self-archiving in repositories, personal webpages or similar, of any version other than the final version of the work produced by the publisher, is not allowed.







